Rail

Wash. receives $31M for rail improvements

Posted on September 21, 2011

The U.S.  Department of Transportation awarded $31.1 million to the State of Washington to improve intercity passenger and freight rail service on the Cascades line.

A highlight of the rail dollars includes:

• Pacific Northwest Corridor – $16.1 million for design, environmental review and construction work to stabilize and improve track structure along the rail line between Blaine, Wash., and the Columbia River Bridge in Vancouver, Wash. The upgrades along this route will increase service reliability by reducing the number of closures and delays due to inclement weather.

• Vancouver-Port Access Rail Improvements – $15 million for construction of a new, rail access route to the Port of Vancouver, including grade separation at an existing rail crossing which has acted as a significant choke point for rail traffic. This enhancement will substantially minimize delays affecting freight trains and Amtrak’s Cascades service. 

The Washington State Department of Transportation and the Port of Vancouver are contributing a combined total of $22 million to this project. Construction is expected to begin in July 2012.

Amtrak’s Cascades Service is one of its faster growing routes. Ridership grew 10 percent in 2010 to 838,251 passengers, and is trending to break that record in 2011.

View comments or post a comment on this story. (0 Comments)

More News

D.C. Metro to introduce new 7000-Series railcars in April

The introduction of the first new train will be the most significant milestone to date for a project that has spanned nearly five years from approval and funding, through design and engineering, to testing and certification.

Alstom secures power supply contract for Kochi metro in India

This contract includes high voltage cabling from the state grid for the new 16-mile metro line. Alstom is the main supplier of Kochi metro after it has been awarded previous orders for 25 Metropolis trainsets, signalling, telecom and electrification. Commercial service is scheduled to begin in March 2016.

Bombardier signs maintenance contract for National Express Essex system

The contract, which is for a ten-year period with the option to extend another 5 years, covers maintenance and spare parts on 74 four-car Class 357 ELECTROSTAR trains and is valued at approximately $213 million.

MBTA gets winter weather advice from 'peer' cities

Suggestions included using special diesel-powered vehicles to clear snow from tracks, as well as using deicing chemicals to prevent the third rail from freezing and losing contact with the trains.

Chicago Transit replacing airport escalator damaged in train wreck

The train wreck, which occurred in the early morning of March 24, 2014, when the operator allegedly fell asleep, injured more than 30 people and caused roughly $9 million in damage. The lead railcar had to be cut up to remove it from the escalator.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The resource for managers of class 1-7 truck Fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close