Rail

Wash. receives $31M for rail improvements

Posted on September 21, 2011

The U.S.  Department of Transportation awarded $31.1 million to the State of Washington to improve intercity passenger and freight rail service on the Cascades line.

A highlight of the rail dollars includes:

• Pacific Northwest Corridor – $16.1 million for design, environmental review and construction work to stabilize and improve track structure along the rail line between Blaine, Wash., and the Columbia River Bridge in Vancouver, Wash. The upgrades along this route will increase service reliability by reducing the number of closures and delays due to inclement weather.

• Vancouver-Port Access Rail Improvements – $15 million for construction of a new, rail access route to the Port of Vancouver, including grade separation at an existing rail crossing which has acted as a significant choke point for rail traffic. This enhancement will substantially minimize delays affecting freight trains and Amtrak’s Cascades service. 

The Washington State Department of Transportation and the Port of Vancouver are contributing a combined total of $22 million to this project. Construction is expected to begin in July 2012.

Amtrak’s Cascades Service is one of its faster growing routes. Ridership grew 10 percent in 2010 to 838,251 passengers, and is trending to break that record in 2011.

View comments or post a comment on this story. (0 Comments)

More News

S.C. city seeking elevated transit line bids

The first phase of the plan would construct a four-mile section elevated guideway above a section of abandoned railroad tracks. The first section of the elevated railway could connect Clemson University's International Center for Automotive Research campus with downtown Greenville.

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

Alstom to supply signalling, infrastructure for Cairo metro line

The company’s shares in these contracts are worth around $90 million.

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close