Rail

Calif.’s Metrolink receives $3.7M to enhance crossing safety

Posted on February 29, 2012

The California Transportation Commission (CTC) allocated $ 3.7 million to fund safety enhancements to one of Metrolink's busiest crossings, the Broadway/Brazil crossing in Glendale.

"Approximately a hundred trains and thousands of cars travel through this intersection every day. This funding will be used to enhance safety at one of the region's busiest crossings," said Glendale City Councilman and Metrolink Board Member Ara Najarian. "Working with cities such as Glendale and Los Angeles, this is part of Metrolink's initiative to upgrade rail crossings across its system to create a sealed corridor of safety."

The enhancements are designed to improve safety at the crossing by adding warning devices and barriers that make it difficult for drivers or pedestrians to circumvent gate arms when a train is approaching. Enhancements include additional exit and pedestrian gates, new raised median islands, flashing signals and right-of-way security gates. Rail signals will also be interconnected with traffic signals to further pre-empt a sequence that ensures the two systems work together direct safe movements among vehicles, pedestrians and trains.

These funds come from the Highway-Railroad Crossing Safety Account, approved by voters as Proposition 1B for the completion of high-priority rail safety projects. Work on this crossing is expected to begin in the second quarter of 2012 and be complete by the third quarter of 2013.

View comments or post a comment on this story. (0 Comments)

More News

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

Alstom to supply signalling, infrastructure for Cairo metro line

The company’s shares in these contracts are worth around $90 million.

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close