Rail

MBTA board approves fare hikes, some cuts

Posted on April 5, 2012

BOSTON — The Massachusetts Bay Transportation Authority’s board approved an average 23% fare hike along with modest cuts in services, with weekend commuter rail cuts being spared, according to the Gloucester Times.

In approving the spending reduction plan, the board acknowledged the measures might be nothing more than a one-year patch for the underfunded transit system. For the full story, click here.

View comments or post a comment on this story. (0 Comments)

More News

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

Alstom to supply signalling, infrastructure for Cairo metro line

The company’s shares in these contracts are worth around $90 million.

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close