Rail

Senate subcommittee approves $100M for rail, New Starts

Posted on April 18, 2012

The U.S. Senate Appropriations Subcommittee on Transportation, Housing and Urban Development and Related Agencies (THUD) approved a $53.4 billion appropriations bill funding investments in the nation's roads, bridges, rail and transit systems, and airports, as well as housing assistance for low-income families and veterans.

One hundred million is included for a "high performance" passenger rail grant program for states, in addition to funding for Amtrak, the TIGER program and the New Starts program, according to the American High Speed Rail Alliance (AHSRA).

Highlights of the bill include:

  • $1.75 billion for the nation's rail infrastructure. Of the total amount provided, $100 million is for the High Performance Passenger Rail grant program to assist states with the improvement of existing intercity services, congestion mitigation and multi-state planning initiatives and $1.45 billion is for Amtrak.
  • $2.044 billion, $89 million above the fiscal year 2012 enacted level, for the Federal Transit Administration's "New Starts" program. This funding supports projects that will provide new or expanded public transportation services.
  • $500 million for the TIGER grant program to support significant transportation projects in a wide variety of modes, including highways and bridges, public transportation, passenger and freight railroads, and port infrastructure. The funding level included in the bill is equal to the fiscal year 2012 enacted level.

The bill now heads to the full Senate Appropriations Committee this week for further review. The House Appropriations Committee has yet to act on the fiscal year 2013 THUD appropriations bill.

For more information, click here.

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close