Rail

Bombardier-supplied Atlanta airport APM expands

Posted on May 16, 2012

Bombardier Transportation is celebrating the start of passenger services on the newly extended Bombardier Innovia APM 100 automated people mover (APM) system at the Hartsfield-Jackson Atlanta International Airport. The transit system extension will serve millions of world travellers at the brand new Maynard H. Jackson Jr. International Terminal, which has now officially opened.

Bombardier won the turnkey system contract to extend the transit system to the new international terminal in December 2007. The contract included the supply of 10 Innovia APM 100 vehicles and all electrical and mechanical equipment associated with the 0.42 mile dual-lane extension.

The APM system at Hartsfield-Jackson Airport first opened in September 1980. Since opening, the system has seen fleet expansions, extensions to the international concourse, two generations of replacement vehicles and numerous system upgrades. Bombardier has operated and maintained the APM system since the start of service in 1980, consistently delivering an on-time performance over 99.5%.

Bombardier's plant in Pittsburgh designed and supplied the electrically powered, rubber tired, driverless Innovia APM 100 vehicles with Bombardier CityFlo 550 automatic train control. Bombardier also supplied communications and power distribution systems, station platform doors, and outfitting the new maintenance and storage facility, as well as providing project management, systems engineering and integration and test and commissioning.

Following the completion of the extension work, the system is now 2.8 miles in length and operates with 59 vehicles. The journey time from the Main Terminal (Concourse T) to the new Concourse F takes approximately 10 minutes.

View comments or post a comment on this story. (0 Comments)

More News

WMATA proposal would refund passengers for delayed trains, buses

According to GM Paul Wiedefeld, the program is an expression of the confidence the agency has in its ability to meet performance targets and provide reliable rush-hour service.

HDR lands Sound Transit light rail extension contract

Sound Transit’s board of directors authorized a contract with HDR’s team to provide planning, preliminary engineering, environmental, and public involvement services for the Tacoma Dome Link Extension project.

KC Streetcar extension gets Fed green light to enter project development phase

The KC Streetcar Main Street Extension project will build upon the downtown streetcar service and will support work required to further develop and advance the southern extension towards the University of Missouri, Kansas City.

Metra seeking RFPs for up to 42 new, remanufactured locomotives

Is asking for proposals for both new and remanufactured engines because it wants to weigh the costs/benefits of both options.

Las Vegas monorail ticket sales expected to fall millions short

The system is budgeted to make about $6.5 million less in ticket sales than was forecast in ridership study.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close