Rail

Bombardier-supplied Atlanta airport APM expands

Posted on May 16, 2012

Bombardier Transportation is celebrating the start of passenger services on the newly extended Bombardier Innovia APM 100 automated people mover (APM) system at the Hartsfield-Jackson Atlanta International Airport. The transit system extension will serve millions of world travellers at the brand new Maynard H. Jackson Jr. International Terminal, which has now officially opened.

Bombardier won the turnkey system contract to extend the transit system to the new international terminal in December 2007. The contract included the supply of 10 Innovia APM 100 vehicles and all electrical and mechanical equipment associated with the 0.42 mile dual-lane extension.

The APM system at Hartsfield-Jackson Airport first opened in September 1980. Since opening, the system has seen fleet expansions, extensions to the international concourse, two generations of replacement vehicles and numerous system upgrades. Bombardier has operated and maintained the APM system since the start of service in 1980, consistently delivering an on-time performance over 99.5%.

Bombardier's plant in Pittsburgh designed and supplied the electrically powered, rubber tired, driverless Innovia APM 100 vehicles with Bombardier CityFlo 550 automatic train control. Bombardier also supplied communications and power distribution systems, station platform doors, and outfitting the new maintenance and storage facility, as well as providing project management, systems engineering and integration and test and commissioning.

Following the completion of the extension work, the system is now 2.8 miles in length and operates with 59 vehicles. The journey time from the Main Terminal (Concourse T) to the new Concourse F takes approximately 10 minutes.

View comments or post a comment on this story. (0 Comments)

More News

San Diego debuts restored trolley for Silver Line

The 68-year old streetcar was acquired as part of a trade with United Transportation Corporation (UTC)/Rail Air Sources (RAS) in exchange for two Siemens U-2 light rail vehicles that were phased out of the MTS fleet.

34 properties purchased for $70M along Honolulu rail transit route

HART's property acquisitions range in price from $22,304 to about $6 million. In June, HART said that it has to acquire 213 properties for the project, and that it had an acquisition budget of $222 million.

Alstom opens new Brazilian Citadis production line

The new production facility will serve the Brazilian market and, in a near future, the Latin America region where a number of new tramway projects are emerging. When fully operational, the facility will employ around 150 people.

FRA ramps up campaign to address nationwide grade crossing safety

The first phase of the effort calls upon local law enforcement agencies to show a greater presence at grade crossings, issue citations to drivers that violate rules of the road at crossings and consider rapid implementation of best practices for grade crossing safety.

S.C. city seeking elevated transit line bids

The first phase of the plan would construct a four-mile section elevated guideway above a section of abandoned railroad tracks. The first section of the elevated railway could connect Clemson University's International Center for Automotive Research campus with downtown Greenville.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close