Rail

PB wins 2 UK rail contracts

Posted on May 17, 2012

Parsons Brinckerhoff (PB) was awarded two significant contracts covering design of both “high-speed” and “conventional” railway systems for the UK’s second high-speed rail line, which will run between London Euston and Birmingham in the West Midlands.

The contracts, worth $12.8 million, have been awarded by HS2 Ltd. under its Professional Services Framework.

PB will work closely with HS2 Ltd to provide a “whole system” approach to optimize the overall rail systems design and provide the appropriate balance with functionality, safety, sustainability, cost and value. It will also take a lead role across all designers for system-wide and operational and maintenance (O&M) issues, and will support other designers on civil engineering, construction and environmental issues in specific geographical areas.

The overall objective of both contracts will be to support HS2 Ltd. in its principal aim of depositing the documents for the hybrid bill as it starts its process through Parliament, by the end of 2013.

PB will work with partners DB International GmbH, providing operational and rolling stock expertise and EC Harris LLP, providing cost planning expertise. The multidisciplinary team will operate from offices across the south east, including London, where it will collocate with the HS2 client team.

View comments or post a comment on this story. (0 Comments)

More News

San Diego debuts restored trolley for Silver Line

The 68-year old streetcar was acquired as part of a trade with United Transportation Corporation (UTC)/Rail Air Sources (RAS) in exchange for two Siemens U-2 light rail vehicles that were phased out of the MTS fleet.

34 properties purchased for $70M along Honolulu rail transit route

HART's property acquisitions range in price from $22,304 to about $6 million. In June, HART said that it has to acquire 213 properties for the project, and that it had an acquisition budget of $222 million.

Alstom opens new Brazilian Citadis production line

The new production facility will serve the Brazilian market and, in a near future, the Latin America region where a number of new tramway projects are emerging. When fully operational, the facility will employ around 150 people.

FRA ramps up campaign to address nationwide grade crossing safety

The first phase of the effort calls upon local law enforcement agencies to show a greater presence at grade crossings, issue citations to drivers that violate rules of the road at crossings and consider rapid implementation of best practices for grade crossing safety.

S.C. city seeking elevated transit line bids

The first phase of the plan would construct a four-mile section elevated guideway above a section of abandoned railroad tracks. The first section of the elevated railway could connect Clemson University's International Center for Automotive Research campus with downtown Greenville.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close