Rail

Siemens wins $73M TriMet contract

Posted on May 24, 2012

Siemens was awarded a $73 million contract to build 18 of its S70 light rail vehicles for TriMet in Portland, Ore.

The vehicles will be manufactured from start to finish at Siemens' rail vehicle manufacturing plant in Sacramento, Calif., a facility powered almost entirely by two megawatts of solar energy. The first new railcars are expected to be delivered in August 2014.

The 18 vehicles were ordered as a part of the Portland-Milwaukie Light Rail Transit Project. This extension includes a light rail alignment that travels 7.3 miles, connecting Portland State University in downtown Portland, inner Southeast Portland, Milwaukie and North Clackamas County. When it opens in September 2015, it will bring the light rail system to a total of 60 miles and 97 stations.

The contract award will bring the total number of S70 light rail cars manufactured for TriMet by Siemens to 40. Siemens Rail Systems has a strong relationship with TriMet, having previously provided more than 100 low floor vehicles, including TriMet's newest fleet of 22 S70 light rail vehicles delivered in 2009.

Compared with the Type 4 model, the Type 5 light rail vehicles for this project are more durable and have energy efficient LED interior lighting; improved HVAC for passenger comfort; more ergonomic cabs for operators; upgraded digital camera technology; improved ADA ramps for better accessibility, improved vehicle seating layout, more advanced vehicle diagnostics and easier maintenance.

The S70 Type 5 has a maximum operational speed of 55 miles per hour. Its low floor design enables passengers to board the train at street level, providing quicker and easier access for people of all abilities.

View comments or post a comment on this story. (0 Comments)

More News

Metra to install suicide prevention signs

The signs will be developed and finalized as part of a Mental Health Awareness Symposium to be hosted by Metra in September to coincide with National Suicide Awareness Month.

Accident, no shows plague commute for LIRR, NJ Transit passengers

Some NJ TRANSIT trains have been canceled this week because engineers are choosing not to work under the terms of their contract amid the summer-long repair work at Penn Station.

Mayor says Miami-Dade can't afford to build more rail lines

Mayor Carlos Gimenez’s $534 million proposal for rapid-bus routes would indefinitely defer the Metrorail expansion promised voters in 2002 during a referendum for a half-percent transportation tax.

FTA, Maryland Transit Administration appeal judge's Purple Line decision

Ruling called for an additional environmental study of the light rail line, despite the fact the project had already been studied and signed-off on by the feds. 

Breakdowns, staffing part of growing Miami Metrorail safety concerns

When state inspectors visited Miami-Dade in late 2016, they concluded the county needed 84 working Metrorail cars a day but that mechanical problems left only 72 that could be deployed for service. State inspectors returned in late June and found Miami-Dade’s daily goal was to have only 60 Metrorail cars in service.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close