Siemens wins $73M TriMet contract

Posted on May 24, 2012

Siemens was awarded a $73 million contract to build 18 of its S70 light rail vehicles for TriMet in Portland, Ore.

The vehicles will be manufactured from start to finish at Siemens' rail vehicle manufacturing plant in Sacramento, Calif., a facility powered almost entirely by two megawatts of solar energy. The first new railcars are expected to be delivered in August 2014.

The 18 vehicles were ordered as a part of the Portland-Milwaukie Light Rail Transit Project. This extension includes a light rail alignment that travels 7.3 miles, connecting Portland State University in downtown Portland, inner Southeast Portland, Milwaukie and North Clackamas County. When it opens in September 2015, it will bring the light rail system to a total of 60 miles and 97 stations.

The contract award will bring the total number of S70 light rail cars manufactured for TriMet by Siemens to 40. Siemens Rail Systems has a strong relationship with TriMet, having previously provided more than 100 low floor vehicles, including TriMet's newest fleet of 22 S70 light rail vehicles delivered in 2009.

Compared with the Type 4 model, the Type 5 light rail vehicles for this project are more durable and have energy efficient LED interior lighting; improved HVAC for passenger comfort; more ergonomic cabs for operators; upgraded digital camera technology; improved ADA ramps for better accessibility, improved vehicle seating layout, more advanced vehicle diagnostics and easier maintenance.

The S70 Type 5 has a maximum operational speed of 55 miles per hour. Its low floor design enables passengers to board the train at street level, providing quicker and easier access for people of all abilities.

View comments or post a comment on this story. (0 Comments)

More News

Alstom to supply new generation metros to Greater Lyon

The binding part of the order includes the delivery of 30 metros for an amount of $152 million dollars.

Texas' TRE increases frequencies, extends service hours

The new schedule features weekday train service every 30 minutes during peak periods. For evening, mid-day and Saturday service, the frequency will be every 60 minutes.

First Hitachi-made rail vehicles for Miami-Dade unveiled

The Miami-Dade Metro contract amounts to about $300 million dollars representing a total quantity of 68 trains (136 cars).

WMATA report on running red lights calls for capping speeds, brighter bulbs

Plans to upgrade signals with LED bulbs at the following problem-spots by the end of the year: National Airport, Silver Spring, Vienna, Grosvenor, Largo, and Farragut North.

Dallas' rail-connected development driving regional growth, study says

Completed or under-construction TOD near DART stations has already generated $69 million in state and local tax revenue.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment



Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close