Rail

Calif.’s Sacramento RT expands light rail, bus service

Posted on August 29, 2012

Effective Sunday, Sept.r 2, 2012, the Sacramento Regional Transit District (RT) will implement major service improvements that will extend night service on light rail and nine major bus routes, increase frequency on highly-utilized bus routes and restructure bus routes to better serve riders.

Light rail service will be extended on the Blue Line and Gold Line to approximately 12:30 a.m. (from 10:30 p.m.) on weekdays and Saturdays. Bus service improvements include new service on weekdays in Citrus Heights (Route 95), and new service on Saturdays in Natomas along Truxel Road (Route 11) and in south Sacramento along Center Parkway (Route 54). RT will extend weekday evening/night service on Routes 1, 21, 23, 30, 51, 56, 80, 81 and 82.

Along with the Green Line to the River District light rail extension, which opened in June 2012, these improvements represent the first time RT has added service since budget cuts forced major service reductions in June 2010.  Since that time, RT has rebounded from a 23% reduction in bus service and a 21% reduction in light rail service to begin adding service.

Over this two-year period, RT has worked diligently to reduce operating costs and cut expenses, while continuing to make progress on significant capital projects. In addition to the opening of the Green Line, construction is under way on a five-level parking structure and two light rail bridges for the Blue Line to Cosumnes River College light rail extension. The anticipated award of a Full Funding Grant Agreement in December 2012 will allow construction to begin on the entire project in early 2013. In addition, RT ended Fiscal Year 2012 with approximately $5.5 million in reserves and recently adopted a Fiscal Year 2013 budget that forecasts an additional $4.5 million in reserve by July 2013.

The September 2012 service changes are the first-year TransitRenewal service improvements based on community input. TransitRenewal —  a comprehensive operational analysis of the RT bus and light rail system — resulted in recommendations on how to restore, restructure and “renew” transit service through 2017.

View comments or post a comment on this story. (0 Comments)

More News

Chicago Transit replacing airport escalator damaged in train wreck

The train wreck, which occurred in the early morning of March 24, 2014, when the operator allegedly fell asleep, injured more than 30 people and caused roughly $9 million in damage. The lead railcar had to be cut up to remove it from the escalator.

DART takes delivery of first streetcar for new service

The vehicle, which was a designed and built by Brookville Equipment Corp., will be the first streetcar in the U.S. that utilizes wireless traction power.

NJ TRANSIT marks Newark Penn Station's 80th year

Opened in 1935, Newark Penn Station is listed on both the State and National Registers of Historic Places. The station was originally designed and still operates as an intermodal facility serving pedestrian, taxi, bus and private vehicle traffic generated by the more than 50,000 transit customers who use the station each day.

Calgary Transit trains, buses breaking down more often

Part of the problem is an aging fleet, according to officials. Calgary Transit placed a $200-million deal in 2013 to buy 60 new light rail vehicles; however, those vehicles will not be operational until 2016.

Alstom to develop zero-emission train

The new trains for Hermann-Hesse railway line will be completely emission-free. In times of increasing energy costs and higher level of pollution, the development of this technology is essential.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close