Calif. opens three new L.A. Union Station tracks, platform

Posted on October 24, 2012

Caltran’s Division of Rail, Amtrak, Southern California Regional Rail Authority and Los Angeles County Metropolitan Transportation Authority celebrated the opening of three new Los Angeles Union Station tracks and a platform to serve Amtrak and Metrolink passengers.

“Amtrak appreciates the efforts of this project’s partners, Caltrans and the Southern California Regional Rail Authority, along with the various private sector contractors and vendors,” said Mike Chandler, Amtrak general superintendent, southwest division. “The new tracks and platform are welcome improvements as they will enhance train operations at the station and benefit ever-growing numbers of passengers seeking to travel by rail.”

Passenger rail service has increased from six daily trains to 22 daily trains, since Caltrans began managing the Pacific Surfliner corridor.

The three new tracks and platform, which were removed more than 35 years ago, were reestablished to serve the increasing train travel demand, which today surpasses that of World War II. Ridership on Amtrak’s Pacific Surfliner, the second busiest corridor in the nation, has increased significantly in the last 10 years.

Los Angeles Union Station is the nation’s fifth busiest train station serving more than two million Amtrak and Metrolink passengers annually. New station tracks 13 and 14 and platform 7 will augment the existing tracks 3 to 12, which currently serve Amtrak national trains, Amtrak California’s the Pacific Surfliner and Metrolink service. Track 15 will be used as storage.

The project’s design maintained the stations historic architectural style and includes north and south stairways and accessible ramps that connect to the main passenger tunnel. Other enhancements include a new electronic passenger information system and energy efficient lighting renovations to the existing platform canopy.

The new track construction, which was managed by Metrolink, began in May 2011 and was complete in September 2012. The $23.5 million project was funded with $20.5 million in Proposition 1B, $2,656,000 in federal funds and $344,000 in local funds.

View comments or post a comment on this story. (0 Comments)

More News

Alstom to supply new generation metros to Greater Lyon

The binding part of the order includes the delivery of 30 metros for an amount of $152 million dollars.

Texas' TRE increases frequencies, extends service hours

The new schedule features weekday train service every 30 minutes during peak periods. For evening, mid-day and Saturday service, the frequency will be every 60 minutes.

First Hitachi-made rail vehicles for Miami-Dade unveiled

The Miami-Dade Metro contract amounts to about $300 million dollars representing a total quantity of 68 trains (136 cars).

WMATA report on running red lights calls for capping speeds, brighter bulbs

Plans to upgrade signals with LED bulbs at the following problem-spots by the end of the year: National Airport, Silver Spring, Vienna, Grosvenor, Largo, and Farragut North.

Dallas' rail-connected development driving regional growth, study says

Completed or under-construction TOD near DART stations has already generated $69 million in state and local tax revenue.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment



Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close