Rail

Amtrak to acquire high-speed trains for NEC

Posted on December 20, 2012

To better meet strong and growing ridership demand on the Northeast Corridor (NEC), Amtrak is advancing plans to acquire new next-generation high-speed train sets and ending its plans to purchase 40 additional high-speed passenger cars to add to the existing Acela Express fleet.

In early 2013, Amtrak will issue a Request for Information (RFI) to formally start the process that will replace the existing 20 Acela Express train sets and add additional train sets to expand seating capacity and provide for more frequent high-speed service on the NEC.

“Moving directly to new high-speed train sets is the best option to create more seating capacity, permit higher speeds, and maximize customer comfort all while improving equipment reliability and reducing operating costs,” said President/CEO Joe Boardman.

He explained that the previous plan to add 40 new passenger cars with newer technology to the older Acela train sets was a stop-gap measure, posed technical challenges and was determined not to be cost effective and insufficient to handle new ridership growth projections.

Boardman made the announcement before a Congressional committee saying that in the past two years Amtrak has moved forward a number of major proposals designed to address the NEC’s growth and development needs.

The proposals are detailed in the Amtrak Vision for the Northeast Corridor 2012 Update Report. First, is the NEC Upgrade Program to bring the corridor up to a state of good repair; add additional capacity to allow limited service growth; and make targeted trip-time improvements for all existing intercity, commuter and freight services. Among the elements is the Gateway Program to build vital track, tunnel and station capacity into the heart of Manhattan to support Amtrak and commuter rail growth.

Second, is the next-generation high-speed rail program to provide America’s economic, political and cultural capitals in the Northeast with the world-class 220 mph high-speed service the region deserves. With possible operating profits over a billion dollars annually and ridership well into 40 million riders a year upon full build-out, Amtrak expects that private capital, probably in the form of a public-private partnership, could play a significant role in this project.

View comments or post a comment on this story. (0 Comments)

More News

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

Ann Arbor transit official urged MDOT not to lease railcars

In 2009, more than a year before MDOT signed a contract to lease and refurbish the double-decker railcars, which since have cost the state about $12 million, an Ann Arbor transit official told MDOT the cars were not suitable for proposed commuter rail services because they didn't meet federal requirements.

Hitachi purchases manufacturer of Honolulu's rail system

Finmeccanica owns all of AnsaldoBreda, which is unprofitable, and 40% of Ansaldo STS, which is profitable, according to the report. The two Ansaldo companies formed a joint venture, Ansaldo Honolulu JV, to design and build the 20-mile, 21-station elevated train system for Oahu under a $1.4 billion contract.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close