Rail

Chicago Transit to conduct rail study

Posted on June 21, 2013

The Chicago Transit Authority (CTA) will conduct a Blue Line Forest Park Branch Feasibility/Vision Study to assess future needs for the entire branch between the Clinton and Forest Park stations. The study would launch a long-range planning strategy for serving customers with a modernized rail line and could stimulate new economic development for the West Side along the Eisenhower Expressway.

The study will be paid for by a combination of local and federal funds, the latter because of a federal earmark secured by U.S. Senator Dick Durbin (D-IL). The analysis is being performed in coordination with the Village of Oak Park, which has contributed local funding to analyze livability issues near Blue Line stations in Oak Park and in Chicago, as well as the IDOT studies in the corridor.

“The Blue Line will play a large role in the future development of the West Side of Chicago and I am pleased that we continue to look for efficiencies and new opportunities to improve service,” said Mayor Rahm Emanuel.

The Blue Line runs through the Eisenhower Corridor “Neighborhoods Now” planning area, in which $186 million in public-private investments are being implemented through a coordinated community improvement plan. Approximately 2,000 new jobs are projected to be created through the initiative, which aims to leverage local transportation assets in support of entertainment and educational opportunities on the Near West Side, among other priorities.

RELATED: "Chicago Railcar Testing Reaches the Home Stretch."

View comments or post a comment on this story. (0 Comments)

More News

FRA makes $25M available for rail infrastructure safety upgrades

Applicants can request funds for safety improvements to railroad infrastructure, including railroad crossings, track, tunnels, bridges, yards and other areas.

NJ TRANSIT's Hudson-Bergen line running modified service for 3rd day

Service has been hampered since overhead catenary wires were yanked down when a dump truck lowered its bed two days ago. There is no timetable for the repair of the wires.

D.C. Metro rules out power cables as factor in recent smoke incident

Passengers aboard the train described a tense atmosphere, with smoke in some of the railcars, flames visible outside the train and the odor of electrical smoke evoking memories of the Jan. 12, 2015, L’Enfant Plaza Metro station incidnet that left one rider dead and scores sickened

Alstom awarded major re-signaling project in the UK

Collaborated with Network Rail to develop an interlocking solution based on Alstom’s Smartlock range that will be ready for ETCS installation allowing trains with ETCS capability to operate on that section of the line.

Sacramento RT taps HDR Inc. for streetcar design

The contract outlines a $10 million budget to construct the streetcar line.The city wants the money to come from property owners near the streetcar line, but they rejected it in a vote last year.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close