Rail

Alstom wins $473M French order

Posted on October 2, 2013

SNCF ordered 34 Coradia Liner trainsets, the latest generation of long-haul trains from Alstom, for approximately $473 million. The trains are expected to enter into service from December 2015.

The Coradia Liner, a long-haul train, is classed between a regional train (TER) and a high-speed train (TGV). It was designed in such a way as to provide intercity lines with a specific identity, more comfort and services with an improved performance. In its current configuration, the train can carry up to 267 passengers.

The Coradia Liner matches exactly the SNCF’s requirements in terms of performance, comfort and services for passengers. It is fully accessible thanks to platform-level boarding. On-board passenger traffic is made much smoother thanks to spacious passenger areas perfectly suited to long-haul journeys. New seats feature upholstered armrests, a power socket and a coat hanger. The floor is coated with special material to reduce ambient sound.

Innovative technical solutions will enable Coradia Liner to reduce travel time on long-haul trips. Large gangways and platforms optimize boarding times. Thanks to distributed power throughout the train, acceleration and braking capacity are improved.

The Coradia Liner is an economical train. Lighter than the previous generation of long-haul trains, it will use significantly less energy and its architecture has been designed to facilitate maintenance operations. It is bimodal (electric and diesel) and complies with all current European standards. It can travel on all tracks in the conventional network.

 Six of the 10 Alstom facilities located in France will be involved in the Coradia Liner project: Reichshoffen (design and assembly), Ornans (engines), Le Creusot (bogies), Tarbes (traction systems), Villeurbanne (on-board computers) and Saint-Ouen (design).

View comments or post a comment on this story. (0 Comments)

More News

Alstom to provide Amtrak with new generation, high-speed train

Will run on the Northeast Corridor. Amtrak and Alstom also signed a long-term contract under which Alstom will provide Amtrak with long-term technical support and supply spare components and parts for the maintenance of the new trainsets.

Metra receives final Electric Highliners

Completes 2010's 160-car purchase to outfit the line with a completely new and modern fleet.

Amtrak's microgrid to serve as backup during power outages

In the aftermath of the 2012 Superstorm Sandy, half of the Sunnyside Yard had to rely on portable backup generators for a month due to a damaged transmission line.

Detroit's M-1 begins testing streetcar line

The slow-moving "speeder" vehicle will travel the rail line as part of a testing regimen that ensures the route is free of obstructions.

Honolulu's rail executive director/CEO resigns

Dan Grabauskas will be paid the final year of contract as part of the separation agreement, a total of $282,250. The board appointed HART board member Mike Formby as acting CEO, effective immediately.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close