Rail

Wabtec to supply Sound Transit with PTC for $34M

Posted on December 17, 2013

Wabtec Corp. signed a $34 million contract with Sound Transit’s commuter railroad, to design, install, test and commission a Positive Train Control (PTC) system.

Sound Transit’s commuter rail line covers 82 miles and carries nearly three million passengers annually.

Under the contract, Wabtec will provide its Interoperable Electronic Train Management System (I-ETMS) equipment and installation for 16 locomotives and 18 passenger transit cab cars. Wabtec will also provide signal design and communications, mapping and systems integration. The Sound Transit system will be fully interoperable with PTC systems being implemented by Class I railroads.

Several Wabtec divisions are involved in the project: Wabtec Railway Electronics, Wabtec Global Services, Xorail and Bach-Simpson.

“As transit agencies around the U.S. continue to deploy PTC over the next several years, Wabtec has the capabilities to continue to play a significant role,” said Albert J. Neupaver, Wabtec’s chairman/CEO. “To date, we have booked nearly $150 million worth of PTC projects in transit.”

View comments or post a comment on this story. (0 Comments)

More News

Chicago Transit replacing airport escalator damaged in train wreck

The train wreck, which occurred in the early morning of March 24, 2014, when the operator allegedly fell asleep, injured more than 30 people and caused roughly $9 million in damage. The lead railcar had to be cut up to remove it from the escalator.

DART takes delivery of first streetcar for new service

The vehicle, which was a designed and built by Brookville Equipment Corp., will be the first streetcar in the U.S. that utilizes wireless traction power.

NJ TRANSIT marks Newark Penn Station's 80th year

Opened in 1935, Newark Penn Station is listed on both the State and National Registers of Historic Places. The station was originally designed and still operates as an intermodal facility serving pedestrian, taxi, bus and private vehicle traffic generated by the more than 50,000 transit customers who use the station each day.

Calgary Transit trains, buses breaking down more often

Part of the problem is an aging fleet, according to officials. Calgary Transit placed a $200-million deal in 2013 to buy 60 new light rail vehicles; however, those vehicles will not be operational until 2016.

Alstom to develop zero-emission train

The new trains for Hermann-Hesse railway line will be completely emission-free. In times of increasing energy costs and higher level of pollution, the development of this technology is essential.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The resource for managers of class 1-7 truck Fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close