Rail

TTC rolls out subway navigation enhancements

Posted on March 5, 2014

The Toronto Transit Commission (TTC) launched a trial on Monday of new signage at Bloor-Yonge Station as part of its efforts to improve and ease navigation of the subway system and its stations. Improved wayfinding is a 2014 Customer Charter commitment.

In October 2013, the TTC board endorsed a presentation by staff to apply already existing line numbers and color-coding to the four subway and rail lines, make greater use of pictograms and improve station entrance signage across the city.

Subway lines are not being renamed; instead, the agency is applying line numbers and colors already in use to existing line names to make navigating the TTC easier for frequent, occasional and first-time riders, as well as those whose first language is not English.

Line 1 is being applied to the Yonge-University-Spadina line; Line 2 to the Bloor-Danforth line; Line 3 to the Scarborough RT and Line 4 to the Sheppard line. The TTC will apply lines five through seven to the future light rail lines approved and funded by Metrolinx to its wayfinding system. The now under construction Eglinton-Crosstown line will become Line 5 when it opens. The numbers reflect the order in which a line was built.

Subway platforms will also get enhanced “you are here” maps to further aid riders using the system. The transit system will also improve signage for those with disabilities.

St. George Station, the TTC’s second busiest subway interchange station, will receive new wayfinding signage in the coming weeks. Staff will then begin surveying customers as they pass through both stations to gather feedback. Any necessary refinements will then be made before rollout across the TTC by the end of 2015. No new money is required for this project, as all design and production is being done-in-house. Printing costs will be absorbed within existing printing budgets.

Greeters will be at Bloor-Yonge Station this week to explain the changes to customers and gather feedback.

RELATED: "NJ Transit implements tech upgrades at Penn Station"

View comments or post a comment on this story. (0 Comments)

More News

Chicago Transit replacing airport escalator damaged in train wreck

The train wreck, which occurred in the early morning of March 24, 2014, when the operator allegedly fell asleep, injured more than 30 people and caused roughly $9 million in damage. The lead railcar had to be cut up to remove it from the escalator.

DART takes delivery of first streetcar for new service

The vehicle, which was a designed and built by Brookville Equipment Corp., will be the first streetcar in the U.S. that utilizes wireless traction power.

NJ TRANSIT marks Newark Penn Station's 80th year

Opened in 1935, Newark Penn Station is listed on both the State and National Registers of Historic Places. The station was originally designed and still operates as an intermodal facility serving pedestrian, taxi, bus and private vehicle traffic generated by the more than 50,000 transit customers who use the station each day.

Calgary Transit trains, buses breaking down more often

Part of the problem is an aging fleet, according to officials. Calgary Transit placed a $200-million deal in 2013 to buy 60 new light rail vehicles; however, those vehicles will not be operational until 2016.

Alstom to develop zero-emission train

The new trains for Hermann-Hesse railway line will be completely emission-free. In times of increasing energy costs and higher level of pollution, the development of this technology is essential.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close