TTC rolls out subway navigation enhancements
Will apply already existing line numbers and color-coding to the four subway and rail lines, make greater use of pictograms and improve station entrance signage across the city.
The Toronto Transit Commission (TTC) launched a trial on Monday of new signage at Bloor-Yonge Station as part of its efforts to improve and ease navigation of the subway system and its stations. Improved wayfinding is a 2014 Customer Charter commitment.
In October 2013, the TTC board endorsed a presentation by staff to apply already existing line numbers and color-coding to the four subway and rail lines, make greater use of pictograms and improve station entrance signage across the city.
Subway lines are not being renamed; instead, the agency is applying line numbers and colors already in use to existing line names to make navigating the TTC easier for frequent, occasional and first-time riders, as well as those whose first language is not English.
Line 1 is being applied to the Yonge-University-Spadina line; Line 2 to the Bloor-Danforth line; Line 3 to the Scarborough RT and Line 4 to the Sheppard line. The TTC will apply lines five through seven to the future light rail lines approved and funded by Metrolinx to its wayfinding system. The now under construction Eglinton-Crosstown line will become Line 5 when it opens. The numbers reflect the order in which a line was built.
Subway platforms will also get enhanced “you are here” maps to further aid riders using the system. The transit system will also improve signage for those with disabilities.
St. George Station, the TTC’s second busiest subway interchange station, will receive new wayfinding signage in the coming weeks. Staff will then begin surveying customers as they pass through both stations to gather feedback. Any necessary refinements will then be made before rollout across the TTC by the end of 2015. No new money is required for this project, as all design and production is being done-in-house. Printing costs will be absorbed within existing printing budgets.
Greeters will be at Bloor-Yonge Station this week to explain the changes to customers and gather feedback.
RELATED: "NJ Transit implements tech upgrades at Penn Station"
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →