Rail

Home movie of 1939 Union Station opening in L.A. unveiled

Posted on April 24, 2014

Photo by Matt' Johnson via Flickr
Photo by Matt' Johnson via Flickr
In honor of Los Angeles Union Station’s 75th Anniversary May 3, Metro and the Academy of Motion Picture Arts and Sciences, in cooperation with the family of Ward Kimball, have restored and are streaming online the only known footage of the opening of what turned out to be the last great rail station in the U.S.

The parade, documented in the home movie, drew half a million spectators to downtown Los Angeles.

The silent 6-minute color film clip features train engines, vintage cars and spectators from the parade that took place on May 3, 1939. The home movie was shot by legendary Disney animator Ward Kimball, creator of numerous classic Disney characters including Jiminy Cricket in “Pinocchio,” Tweedledee and Tweedledum in “Alice in Wonderland,” and Lucifer the Cat in “Cinderella.” In 1970, Kimball received an Academy Award for Best Short Subject (Cartoon) for “It’s Tough to be a Bird.”

RELATED: Grand Central Terminal Endures as Transportation Icon

Kimball was an avid railway enthusiast and collector of old railroad memorabilia. His personal film collection at the Academy Film Archive includes footage of Kimball‘s own Grizzly Flats Railroad and other documentaton of a range of transportation technologies.

View comments or post a comment on this story. (0 Comments)

More News

Calif.'s Metrolink puts PTC into revenue service demo mode

With this latest accomplishment, Metrolink remains on track to become the nation’s first passenger rail system to have a fully implemented, interoperable PTC system in place.

Alstom to supply signalling, infrastructure for Cairo metro line

The company’s shares in these contracts are worth around $90 million.

Hyperloop to build full-scale track next year

The Quay Valley, Calif. Hyperloop track will be built using HTT’s tube, capsule and station models. It will be instrumental in optimizing passenger system needs — such as loading, departure and safety considerations — to ensure Hyperloop is ready for larger-scale operation.

Keolis/MBTA make strides with commuter rail snowstorm recovery

Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

Alstom to deliver to Sydney Citadis X05

Company is responsible for the integrated tramway system, which includes the design, delivery and commissioning of 30 coupled Citadis X05 trams; power supply equipment, including APS -ground power supply; signaling systems, the energy recovery system HESOP, depot equipment and maintenance.

See More News

Post a Comment

Post Comment

Comments (0)

Please sign in or register to .    Close