Keolis/MBTA make strides with commuter rail snowstorm recovery
Milestones include the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.

MBTA Snow Removal Red Line, Quincy, February 18, 2015. MassDOT photo.

MBTA Snow Removal Red Line, Quincy, February 18, 2015. MassDOT photo.
Keolis, the operator of MBTA commuter rail, announced several milestones Tuesday, including the completion of snow and ice removal from all platforms and critical rail switches system-wide, as well as the addition of supplemental trains, doubledecker and standard passenger cars to increase capacity and combat overcrowding.
Over the weekend, 700 tons of snow were melted with the assistance of a snowmelter on loan from the Commonwealth of Massachusetts, and more than 180 truckloads of snow were removed from key maintenance facilities, while 184 railway switches were cleaned of snow and ice. Keolis employees have removed 10.6 million cubic feet of snow from station platforms since January 27th and 594 million cubic feet from tracks and track infrastructure.
MBTA Commuter Rail continues to operate on a limited-service schedule (www.mbta.com/winter) as it begins repairs on its locomotive fleet and passengers should continue to plan accordingly for delays and cancelations. Keolis will remain vigilant with snow again in the forecast for Tuesday night into Wednesday, but commuter rail customers are advised to be aware of possible delays and cancelations under an already-reduced schedule.
Keolis has begun adding extra trains to service commuter rail lines experiencing overcrowding on trains and platforms due to the reduced schedule. These trains will be used sporadically system-wide as extra trains become available and announced via station platform signs and T-Alerts. The recovery plan intends to return three locomotives to service every week on the path to restoring regular weekday service.
Keolis recognizes the extremely hard work of its employees as the recovery process continues, many of whom have been working around the clock since January 27th to keep and/or return trains in service, clear tracks and switches and get the system back to full service as soon as possible for our customers, said a company statement.
More Rail

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project
The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.
Read More →
CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail
Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.
Read More →
LA Metro September Ridership Climbs 3.9%, Led by Rail Growth
The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.
Read More →
First Full MetroLink Rail Expansion Completed in 20 Years with $192M Airport Project
The project links two St. Louis-area airports by light rail while adding roadway and bike trail connections to improve regional access and mobility.
Read More →
Utilimarc Launches SmartReplace to Optimize Fleet Replacement Decisions
AI-powered SmartReplace helps fleets prioritize vehicle replacements, model budget scenarios, and build more defensible long-term strategies.
Read More →
Scenes from APTA TRANSform & EXPO 2026
Transit leaders, manufacturers, and industry professionals gathered in Chicago to explore new technologies, share ideas, and discuss the future of public transportation.
Read More →
USDOT Awards $416 Million for Florida Rail Crossing Safety Upgrades, New Brightline Station
The projects aim to reduce risks for motorists and pedestrians at rail crossings while expanding passenger rail access along Florida’s Space Coast.
Read More →
OCTA Declares Emergency to Protect Rail Corridor From Coastal Erosion
The California agency is accelerating shoreline protection and plans to place approximately 690,000 cubic yards of sand along the San Clemente coast to protect a key passenger and freight rail link.
Read More →
More Than a Summer Job: Building the Next Generation of Transit Talent
The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.
Read More →
Airo Trains Make Their Amtrak Cascades Debut in the Pacific Northwest
Effective immediately, two cutting-edge Airo trainsets will join the Amtrak Cascades route, operating four daily trips between Vancouver, B.C., Seattle, Portland, and Eugene, Oregon, marking the first introduction of Airo trains into passenger service anywhere in the country.
Read More →