Rail

Chicago's Metra completes charging station installation

Posted on October 7, 2015

Chicago's Metra has completed installation of charging stations at four of its downtown stations.

Charging stations are now available in the waiting areas at Millennium Station, Van Buren Street Station, LaSalle Street Station and the Ogilvie Transportation Center, and in the lower suburban concourse at Ogilvie near the Metra Market, providing Metra customers with a convenient and free place to recharge electronic mobile devices including smartphones, tablets and laptops. Metra also anticipates installing a charging station in the coming months in its ticketing area at Chicago Union.

“Making the right capital investments so that riders have access to technology is a good business decision for Metra. Our riders have told us that access to their electronic devices is important and we were able to respond to their needs by adding this amenity to our downtown stations,” Metra Executive Director/CEO Don Orseno said. “Listening to our customers and responding whenever feasible helps us attract and retain the riders we need to keep ticket revenues up and fare increases down.”

The charging stations were fabricated using manpower and resources from Metra’s rail yard shops at an estimated cost of $6,000 to $7,000 for all station installations.

To further enhance the agency’s customer connectivity options, Metra will also be installing free Wi-Fi in the waiting areas of downtown stations within 45 days, and it recently announced plans to test Wi-Fi on 11 cars systemwide before January 2016.

View comments or post a comment on this story. (0 Comments)

More News

CRRC announces ship date for MBTA pilot cars

The company is the first Chinese railcar builder to enter into the U.S. rail car manufacturing market.

STV, WSP USA to support L.A. Metro rail vehicle acquisition

Acquisition of new heavy rail vehicles and associated equipment that will play a key part in Metro’s systemwide rail expansion over the next decade.

Stadler breaks ground on railcar manufacturing plant in Salt Lake City

Its 62-acre property boasts 75,000 square feet of production space for the bogie, main, pre- and final assembly of single- and bi-level trains.

Stadler, Fort Worth Transportation Authority unveil 1st U.S. FLIRT train

The new commuter trains for TEXRail have been designed to reach maximum speeds of 81 mph and boast a coupled length of 266 feet each.

Design-build taking transit into the future

Design-build minimizes risk, reduces delivery time, keeps budgets in line, and mitigates funding partner concerns throughout project duration. With traditional design-bid-build, owners, designers, and contractors are segregated from design concept to final construction.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close