Rail

D.C. Metro rules out power cables as factor in recent smoke incident

Posted on April 27, 2016

Larry Levine
Larry Levine

The Washington Metropolitan Area Transit Authority’s (Metro) announced that while it has not yet identified the root cause of Saturday’s smoke incident outside Friendship Heights Station, investigators have eliminated power cables as a contributing factor.

Passengers aboard the train described a tense atmosphere, with smoke in some of

the railcars, flames visible outside the train and the odor of electrical smoke evoking memories of the Jan. 12, 2015, L’Enfant Plaza Metro station incidnet that left one rider dead and scores sickened, according to the Washington Post.

As a preliminary matter, the investigation is focusing on a foreign object, specifically a metal part of a railcar, becoming dislodged and making contact with the electrified third rail. The foreign contact is believed to have caused a loud noise, flash and smoke.

Investigators have conducted inspections of all power infrastructure in the tunnel, as well as all cars of the incident train, to reach this preliminary conclusion.

Preliminary Investigative Findings include:

  • At approximately 7:19 p.m., Saturday, April 23, the operator of Red Line train #107 traveling outbound reported hearing a loud boom and smoke entering the lead car.
  • The train consisted of eight cars: four 5000-series and four 1000-series.
  • The train stopped in the tunnel prior to Friendship Heights Station.
  • Passengers were moved into the trailing cars of the train.
  • The train operator was instructed to reverse direction and was given permission to move back to Tenleytown Station, where the train was offloaded.
  • Prior to the train being moved, an unknown passenger pulled an emergency door release, causing the train to lose "all doors closed" indication. It was confirmed that no passengers "self-evacuated" from the train. Once all doors were confirmed closed, the train was moved.
  • There were no injuries.

Metro and the Federal Transit Administration continue to investigate the cause of this incident. Updates will be provided as information is developed.

View comments or post a comment on this story. (0 Comments)

More News

Honolulu rail project costs could reach $9.5B

The high figure is based on a scenario in which the general excise tax surcharge for the rail gets extended another 10 years at the same 0.5% rate.

WMATA launches plan to get rail line 'Back to Good'

Plan includes a train reliability program that cuts railcar delays by first retiring the oldest (1000-series) and least reliable (4000-series) cars in the fleet by the end of 2017.

Alstom's Citadis begins dynamic testing on Ottawa's O-Train line

During this phase of the project, the trains will undergo various tests, including dynamic testing at speeds of approximately 50 mph up to approximately 62 mph.

Proposed downtown L.A. streetcar gets big boost

Supporters say ridership on the 3.8-mile service could reach 6,000 people per day.

Wabtec completes majority ownership of Faively Transport

The combination creates one of the world's largest public rail equipment companies, with revenues of about $4.2 billion and a presence in all key transit and freight rail markets worldwide.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close