METRO Magazine Logo
MenuMENU
SearchSEARCH

STV joint venture renewed for Ottawa light rail expansion

The STV/AECOM/Morrison Hershfield/McMillen Jacobs Associates joint venture contract isfor the preliminary engineering and program management of the second stage of the O-Train.

June 8, 2016
STV joint venture renewed for Ottawa light rail expansion

O-Train

2 min to read


O-Train

The City of Ottawa awarded the STV/AECOM/Morrison Hershfield/McMillen Jacobs Associates joint venture a contract for the preliminary engineering and program management of the second stage of the transformative O-Train light rail transit extension program.

This $3 billion initiative includes the extension of three existing light rail routes — east and west along the Confederation Line and south along the Trillium Line — totaling approximately 18.64 miles of new rail and 19 new stations.

Ad Loading...

The program will seamlessly connect riders to employment nodes such as Tunney’s Pasture, Orléans Town Centre and Confederation Heights; academic institutions including University of Ottawa, Carleton University and Algonquin College; shopping centers such as Lincoln Fields, Rideau Centre, and Place d’Orléans; and cultural and recreational destinations like the National Arts Centre, the Rideau Canal, Parliament Hill and Westboro Beach.

The goal of Stage 2, which was approved unanimously by the Ottawa City Council in 2013, is to bring 70% of all city residents within 3.1 miles of rail transportation, leading to shorter commutes, cleaner air and a stronger economy.

“We are thankful for the opportunity to continue our support of the City of Ottawa as it demonstrates its ongoing commitment to meet the needs of its growing population through the addition of new transportation options,” said Keith Mackenzie, P.E., S.E., STV VP and program manager for the extensions. “The city’s O-Train extension program stands to have a profound effect on the region by creating new jobs and reducing vehicular congestion on the city’s roadway network.”

The joint venture team was previously awarded the preliminary engineering and program management services for the initial light rail transit project known as the Confederation Line, or Stage 1. This stage included new underground tunnels as well as conversion of a fully built-out bus rapid transit service into a light rail transit line, running from Tunney’s Pasture through downtown Ottawa to Blair Station.

The Trillium extension program will double the existing line’s ridership capacity with the addition of new passing sidings and functional enhancements at stations and maintenance facilities. Since it was introduced in 2001, ridership on the O-Train has nearly doubled to 12,000 trips per-day.


More Rail

Graphic from Amtrak promoting the B&P Tunnel Replacement and Frederick Douglass Tunnel project, featuring the Amtrak logo, project title and an illustration of a high-speed train near the West Baltimore MARC Station.
Railby News/Media ReleaseMarch 17, 2026

Amtrak Announces Community Grants for Projects Near Baltimore’s New Frederick Douglass Tunnel

Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.

Read More →
Amtrak train with logo
Railby StaffMarch 16, 2026

Amtrak Marks Restoration of Two South Carolina Stations

The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.

Read More →
A view looking down the rail across the new Portal North Bridge.
Railby Staff and News ReportsMarch 13, 2026

NJ Transit, Amtrak Prepare to Open First Track on New Portal North Bridge

The new bridge will begin carrying passenger trains on March 16, replacing a 116-year-old swing bridge that has long caused delays.

Read More →
Ad Loading...
Caltrain trains on tracks
Railby StaffMarch 6, 2026

Caltrain Adopts Corridor-Wide Right-of-Way Safety Strategy

Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.

Read More →
A photo of rail tracks in Ottawa, Canada

Building a National Framework for Transit Safety and Consistency

On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.

Read More →
Stairs in a New York rail station with text reading "USDOT Invests $686 Million to Modernize Aging Rail Stations."
Railby StaffMarch 2, 2026

FTA Invests $686M to Modernize Aging Rail Stations

Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.

Read More →
Ad Loading...
A purple MBTA train at a Mansfield Station platform.
Railby StaffFebruary 27, 2026

MBTA Updates Rail Modernization Plan to Expand Reliability and Accessibility

The strategy outlines near- and long-term upgrades to ease congestion, support housing growth, and advance statewide climate goals.

Read More →
LA Metro underground station with vehicle
Railby StaffFebruary 27, 2026

LA Metro Sets D Line Subway Extension Launch Date

The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.

Read More →
MBTA railcars
Railby StaffFebruary 26, 2026

Boston's MBTA Marks Progress in Regional Rail Modernization

The procurement advances the agency's broader efforts to modernize its rail fleet and position Regional Rail for long-term improvement.

Read More →
Ad Loading...
An Amtrak Acela
Railby StaffFebruary 26, 2026

Amtrak Sets New Course for Long-Distance Fleet Renewal

Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.

Read More →