METRO Magazine Logo
MenuMENU
SearchSEARCH

STV joint venture renewed for Ottawa light rail expansion

The STV/AECOM/Morrison Hershfield/McMillen Jacobs Associates joint venture contract isfor the preliminary engineering and program management of the second stage of the O-Train.

June 8, 2016
STV joint venture renewed for Ottawa light rail expansion

O-Train

2 min to read


O-Train

The City of Ottawa awarded the STV/AECOM/Morrison Hershfield/McMillen Jacobs Associates joint venture a contract for the preliminary engineering and program management of the second stage of the transformative O-Train light rail transit extension program.

This $3 billion initiative includes the extension of three existing light rail routes — east and west along the Confederation Line and south along the Trillium Line — totaling approximately 18.64 miles of new rail and 19 new stations.

Ad Loading...

The program will seamlessly connect riders to employment nodes such as Tunney’s Pasture, Orléans Town Centre and Confederation Heights; academic institutions including University of Ottawa, Carleton University and Algonquin College; shopping centers such as Lincoln Fields, Rideau Centre, and Place d’Orléans; and cultural and recreational destinations like the National Arts Centre, the Rideau Canal, Parliament Hill and Westboro Beach.

The goal of Stage 2, which was approved unanimously by the Ottawa City Council in 2013, is to bring 70% of all city residents within 3.1 miles of rail transportation, leading to shorter commutes, cleaner air and a stronger economy.

“We are thankful for the opportunity to continue our support of the City of Ottawa as it demonstrates its ongoing commitment to meet the needs of its growing population through the addition of new transportation options,” said Keith Mackenzie, P.E., S.E., STV VP and program manager for the extensions. “The city’s O-Train extension program stands to have a profound effect on the region by creating new jobs and reducing vehicular congestion on the city’s roadway network.”

The joint venture team was previously awarded the preliminary engineering and program management services for the initial light rail transit project known as the Confederation Line, or Stage 1. This stage included new underground tunnels as well as conversion of a fully built-out bus rapid transit service into a light rail transit line, running from Tunney’s Pasture through downtown Ottawa to Blair Station.

The Trillium extension program will double the existing line’s ridership capacity with the addition of new passing sidings and functional enhancements at stations and maintenance facilities. Since it was introduced in 2001, ridership on the O-Train has nearly doubled to 12,000 trips per-day.


More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →