METRO Magazine Logo
MenuMENU
SearchSEARCH

Metra unveils winterization plans, customer communications

Through the use of GPS technology, the agency's communication specialists can monitor the position and timeliness of all trains in the system in real time and alert passengers in a variety of ways.

December 6, 2017
Metra unveils winterization plans, customer communications

Metra communications specialists working on the Metra Electric Line desk in the GPS Center on Tuesday, Dec. 5. Photo: Metra

4 min to read


Metra communications specialists working on the Metra Electric Line desk in the GPS Center on Tuesday, Dec. 5. Photo: Metra

Metra recently unveiled its winter weather preparation plans for the system, which included a tour of its GPS Center for reporters to demonstrate how it communicates with customers.

The GPS Center, located in Metra’s headquarters building at 547 W. Jackson, is where platform announcements, website updates, email alerts and most service Tweets originate. Through the use of GPS technology, the agency's communication specialists can monitor the position and timeliness of all trains in the system in real time and alert passengers in a variety of ways about delays, disruptions and other service issues.

“Our GPS Center is the heart of our communication efforts,” said Metra CEO/Executive Director Don Orseno. “Of course, we strive to operate all of our trains on time, but when they run behind due to weather or others reasons, we also strive to communicate those delays in a timely and accurate manner.”

As soon as a train falls six minutes or more behind, Metra staffers will start making announcements on board the delayed train and on the platforms where passengers are waiting. Announcements can be made by typing a message, which is then turned into an automated audio announcement and posted on scrolling signs in most stations and ADA cars, or by speaking directly into a microphone to make a live announcement. Using a separate system, the announcement can also be sent directly to the delayed train.

If a delayed train falls 15 minutes behind schedule (30 minutes on weekends), then we send an alert that warns riders the train is delayed, giving the length of the delay and the reason. The alert is emailed to riders who have signed up to receive them, sent out on Twitter and posted on the Metra website, metrarail.com. Metra's social media team may supplement the GPS tweets with additional information.

Ad Loading...

Metra's winterization efforts include stockpiling 63,000 bags (more than 3.1 million pounds) of salt to cover the platforms and other areas under Metra’s responsibility. Photo: Metra

If the agency knows about something that is going to delay more than one train — such as a grade-crossing incident or a switch failure at a critical location — it will issue a “blanket” alert as soon as it is known.

In 2018, Metra will be working on a major upgrade to its GPS technology, which will help communication with customers about delays and disruptions.

Winterization Efforts
Each year, Metra takes the following steps to help mitigate the impact of winter weather on railroad operations: 

  • Inspect and test Metra’s 463 mainline switches .

  • Test nozzles on 275 hot-air switch heaters.

  • Inspect and test the remaining 188 mainline switch heaters that use gas flames or electric current.

  • Inspect snow and ice shields on 73 switches, which cover part of the switch machinery and help concentrate and contain the hot air from the switch heaters.

Ad Loading...
  • Inspect and test heaters on all railcars. Metra has about 850 railcars on its diesel lines and 186 Highliner cars on the Metra Electric Line.

  • Inspect doors on older cars for defects, worn guides and corrosion.

  • Stockpile 63,000 bags or more than 3.1 million pounds of salt to cover the platforms and other areas under Metra’s responsibility.

  • Inspect and test 45 snow plows at its disposal, not counting the equipment used by its parking vendor and the numerous municipalities responsible for clearing parking lots and other areas around most of its suburban stations.

  • Inspect and test Metra’s three cold-air blowers and five hot-air jet blowers to clear its largest and most critical yards.

Unfortunately, no railroad can completely eliminate a common winter switch problem: snow and ice accumulates on the underside of locomotives and train cars, and then falls off the train, into a switch, as the train rumbles over it. The snow and ice can then prevent the movable part of the switch from making contact with the rail. If that contact can’t be made, an electric circuit cannot be completed and, as a failsafe, the signal system will not permit a train to proceed over the switch. In those cases, the switch must be cleared manually and Metra routinely assigns employees to key switching locations during winter storms to keep the switches clear.

Steps before/during a major storm include, 

Ad Loading...
  • Dispatching Metra signal/switch maintainers to key locations and staffing them 24/7.

  • Dispatching about 350 workers to shovel and salt platforms and other areas.

  • Putting crews and equipment in place to keep 24 rail yards clear.

  • Fueling our locomotives in outlying rail yards overnight.

  • Leaving our engines on overnight.

Ad Loading...
  • Running extra “ice trains” overnight on the Metra Electric Line to prevent ice from accumulating on the overhead power lines.

When extreme weather conditions do not allow for operation of regularly scheduled service, Metra may implement snow schedules, which include about 75 to 80 percent of regularly scheduled trains.




More Rail

An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →
Ad Loading...
Crowd waiting for LA Metro bus
Management•by Staff and News Reports•October 16, 2026

LA Metro September Ridership Climbs 3.9%, Led by Rail Growth

The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.

Read More →
METRO Magazine graphic featuring an aerial view of MetroLink extension construction, with the headline “MetroLink Expansion Completed With $192M Airport Project.”
Rail•by Staff and News Reports•October 14, 2026

First Full MetroLink Rail Expansion Completed in 20 Years with $192M Airport Project

The project links two St. Louis-area airports by light rail while adding roadway and bike trail connections to improve regional access and mobility.

Read More →
Taking the Guesswork Out of Fleet Replacement
Management•by Alex Roman•October 14, 2026

Utilimarc Launches SmartReplace to Optimize Fleet Replacement Decisions

AI-powered SmartReplace helps fleets prioritize vehicle replacements, model budget scenarios, and build more defensible long-term strategies.

Read More →
Ad Loading...
An overhead view of APTA EXPO's show floor.
Management•by Alex Roman•October 9, 2026

Scenes from APTA TRANSform & EXPO 2026

Transit leaders, manufacturers, and industry professionals gathered in Chicago to explore new technologies, share ideas, and discuss the future of public transportation.

Read More →
METRO Magazine graphic featuring officials at a Florida rail funding announcement, with the headline “$416M Awarded for Florida Rail Crossing Upgrades and More.”
Rail•by Staff and News Reports•October 8, 2026

USDOT Awards $416 Million for Florida Rail Crossing Safety Upgrades, New Brightline Station

The projects aim to reduce risks for motorists and pedestrians at rail crossings while expanding passenger rail access along Florida’s Space Coast.

Read More →
Coastal railroad tracks run between a steep bluff and the Pacific Ocean in San Clemente, California, with rock barriers protecting portions of the shoreline.
Rail•by Elora Haynes•October 1, 2026

OCTA Declares Emergency to Protect Rail Corridor From Coastal Erosion

The California agency is accelerating shoreline protection and plans to place approximately 690,000 cubic yards of sand along the San Clemente coast to protect a key passenger and freight rail link.

Read More →
Ad Loading...
DRPA interns with program swag.
Management•by Alex Roman•October 1, 2026

More Than a Summer Job: Building the Next Generation of Transit Talent

The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.

Read More →