Rail

L.A. Metro board approves light rail extension

Posted on July 5, 2018

A rendering of the East San Fernando Valley Transit Corridor Project.
L.A. Metro
A rendering of the East San Fernando Valley Transit Corridor Project.
L.A. Metro

The Los Angeles County Metropolitan Transportation Authority (Metro) board of directors approved light rail as the official technology for the East San Fernando Valley Transit Corridor Project, which will connect the Metro Orange Line Station in Van Nuys with the Metrolink Station in Sylmar/San Fernando.

The $1.3-billion transit project, which is funded by Measure R and M voter-approved sales taxes as well as SB-1 gas tax funds, eliminates bus rapid transit as an option and will now move from the draft to the final environmental review stage. If the final environmental document is certified by the Metro board early next year, construction could begin in 2021, with the rail line opening in 2027 ahead of the 2028 Olympic and Paralympic Games in the Los Angeles area.

Spanning 9.2 miles, the project will include 14 new stations and will travel in the median of Van Nuys Boulevard before turning northwest on Metro-owned rail right-of-way adjacent to San Fernando Road. Destinations that will be available along the line include the Van Nuys Civic Center, Van Nuys Amtrak/Metrolink Station, Panorama Mall, Van Nuys multi-residential housing, Arleta High School, downtown San Fernando, and others. A one-way trip from end-to-end on the rail line is expected to take approximately 31 minutes.

The board’s action marks the planned return of street-level local stop rail service in the Valley. The Pacific Electric Red Cars discontinued service along portions of Van Nuys Boulevard back in 1952.

The Metro Board also approved the agency’s recommendation to build a rail yard to store and maintain Metro light rail vehicles across the street from the Van Nuys Amtrak/Metrolink Station. The approved site contained the least community and economic impacts of any of the options Metro studied. The site also received the most community support.

As part of its ongoing study, Metro will coordinate the rail line’s possible connections in Van Nuys with other planned transit projects, including the Metro Orange Line Improvements Project and the Sepulveda Transit Corridor Project. Other planned transit projects in the area include the North San Fernando Valley Bus Rapid Transit (BRT) Project, the North Hollywood to Pasadena BRT Corridor Project, and the 2020 electrification of all Metro Orange Line buses. The Orange Line is planned to be converted to light rail by 2057 unless it can be delivered sooner via a public-private partnership.

“Metro has no less than five major transit projects planned to improve mobility in the San Fernando Valley in the near future,” said Metro CEO Phillip A. Washington. “We are delivering on our promise to Valley voters to dramatically increase their transit choices for traveling across town or across the region on Metro.”

Metro began its alternatives analysis for the project in 2010. Originally, 29 alternative routes and transit modes were studied. As Metro moved through the environmental process, those choices were narrowed to a single project that could be built with available funding. In 2016, Metro was able to secure additional Measure M funding and this year Metro received more than $400 million for the project from SB-1, the state’s gas tax and vehicle fee transportation funding program that was approved by the California Legislature and signed into law by Gov. Jerry Brown last year.

View comments or post a comment on this story. (0 Comments)

More News

Nonprofit repurposes Amtrak Acela seating into luxury bags

People for Urban Progress is known for repurposing dated infrastructure through design and fabrication projects.

Bombardier-Alstom to supply 153 additional Montréal railcars

Through this agreement, STM will benefit from the replacement of part of its fleet at a lower cost.

Metra adds more vehicles to replace aging fleet

The F59PHs were built by the Electro-Motive Division of General Motors Corp. in 1988.

Port Authority NY/NJ debuts cellphone service in underground stations

Phased-in connectivity from major cell phone carriers will continue over the course of the rest of the year and into early 2019.

Milwaukee launches long-awaited streetcar service

Property taxes along the M-line route have already increased 28%, according to Mayor Tom Barrett.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation