Security and Safety

NTSB puzzled by SUV involved in Metro-North crash

Posted on February 5, 2015

NTSB Member Sumwalt and investigative team discuss details of the Metro North crash. NTSB
NTSB Member Sumwalt and investigative team discuss details of the Metro North crash. NTSB

VALHALLAH, N.Y. — The force of the fatal crash between a Metro-North commuter train going nearly 60 mph and a stopped SUV was so severe that the electrified third rail broke off and pierced the vehicle's chassis and gas tank before penetrating the first train car and igniting a "fierce fire," investigators said Wednesday, Newsday reported.

Six people died in the crash Tuesday night along the Harlem Line in the Westchester community of Valhalla. The train thrust into the vehicle's side and pushed it along the tracks for up to 1,000 feet, said National Transportation Safety Board officials Wednesday, the report said.

What is most puzzling to investigators at the scene is why the SUV was on the grade crossing as the warning gate lowered and slammed it on the rear — seconds before impact, according to the report.

"For reasons that are not precisely known at this time, for whatever reason, the Mercedes SUV was stopped on the tracks," Sumwalt said at a news conference.

NTSB recorder specialist George Haralampopoulos search for event recorder in the Metro North train.NTSB
NTSB recorder specialist George Haralampopoulos search for event recorder in the Metro North train.NTSB
 
In coming days, the NTSB team will interview the conductor and engineer, and analyze the crash from every possible angle, Sumwalt said.

Train involved in Valhalla, N Y, Metro-North accident at maintenance facility to be further examined. NTSB
Train involved in Valhalla, N Y, Metro-North accident at maintenance facility to be further examined. NTSB
For the full s
Board Member Robert Sumwalt views damaged rail car involved in Metro North train accident. NTSB
Board Member Robert Sumwalt views damaged rail car involved in Metro North train accident. NTSB
tory, c  lick here.

View comments or post a comment on this story. (2 Comments)

More News

Metra unveils new line schedule allowing for PTC operation

Under PTC, the crew of a train must initialize the system (enter train and route information) before each individual run.

FRA approves MBTA's PTC program extension to 2020

Work to install PTC infrastructure on the MBTA Commuter Rail network is in various stages of completion and testing on each line.

NYC Transit warns against walking, riding between subway cars

Seven people died while walking or riding between subway cars in 2018, including four people in December alone.

Calif.'s NCTD completes full PTC implementation

Is one of only four U.S. agencies that has completed PTC implementation by the federally-mandated deadline of Dec. 31, 2018.

NJ TRANSIT reaches major PTC milestone

The achievement means agency can apply for an alternative schedule to have PTC fully operational by the end of 2020.

See More News

Post a Comment

Post Comment

Comments (2)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation