NTSB issues update on Philadelphia Amtrak crash investigation
An examination of the signals systems has revealed no anomalies or malfunctions. The NTSB has possession of the Amtrak engineer’s cell phone. Additionally, under its enforcement authority, the Federal Railroad Administration subpoenaed and obtained the engineer’s cell phone records and has shared that data with NTSB forensic experts.
National Transportation Safety Board (NTSB) investigators have completed most of their on-scene documentation work at the Amtrak Train 188 accident site and at the Amtrak facilities in Delaware. Additional 3D laser scanning of the train cars will be completed in the coming weeks.
An examination of the signals systems has revealed no anomalies or malfunctions.
Ad Loading...
The NTSB has possession of the Amtrak engineer’s cell phone. Additionally, under its enforcement authority, the Federal Railroad Administration subpoenaed and obtained the engineer’s cell phone records and has shared that data with NTSB forensic experts. Although the records appear to indicate that calls were made, text messages sent and data used on the day of the accident, investigators have not yet made a determination if there was any phone activity during the time the train was being operated.
To make that assessment, investigators have started the process of correlating the time stamps in the engineer’s cell phone records with multiple data sources including the locomotive event recorder, the locomotive outward facing video, recorded radio communications and surveillance video.
The processes involved in correlating time stamps for all these devices are detailed and lengthy. Because of variations in time stamps for each data source, each one must be correlated to the same time zone so that a factual timeline of events can be developed that will allow investigators to understand if any phone activity has any relevance to the accident.
Investigators interviewed the engineer of the SEPTA train that had stopped after being struck by an object that had shattered the windshield of the locomotive. The SEPTA engineer said that the Amtrak engineer announced on the radio, “hot track rail two,” to let him know that the Amtrak train was about to pass the stopped SEPTA train. He saw Amtrak 188 pass on track 2 and did not notice anything unusual.
Interviews with passengers and emergency responders will continue over the coming weeks. Investigative specialists in crashworthiness and survival factors are interviewing passengers that survived the accident in order to understand the circumstances of the evacuation as well as how injuries correlated with train car and seating positions.
Ad Loading...
Amtrak has provided the NTSB with the engineer’s training and employment records. He had been operating trains in the Washington-Boston Northeast Corridor for about three years. He had been specifically assigned the Washington-New York segment of the corridor for several weeks.
Today’s riders—and the communities you serve—expect more from public transit. While ADA compliance is required, leading transit agencies know that true accessibility also means delivering dignity, efficiency, and a better rider experience. This whitepaper reveals why forward thinking agencies nationwide choose the Low Floor Frontrunner as their first choice for ADA compliant vehicles—setting a new standard with passenger first design, faster boarding, improved safety, and unmatched operational performance.
Fred Ferguson, president and CEO of the American Bus Association (ABA), discussed how the industry prepares for emergencies, the growing recognition of motorcoaches as critical infrastructure, and steps operators can take to strengthen disaster readiness.
The approved contract modification will increase funding for transit security officer services to a total not-to-exceed amount of $32.1 million, ensuring a continued and visible security presence across DART’s buses, trains, stations, and facilities.
The Siemens CBTC System, Trainguard MT, in compliance with New York Subway Interoperability Interface Specifications, enables trains to run as close as 90 seconds apart, using next-generation signaling and continuous communication to keep operations moving seamlessly.
According to the new quarterly data, there were double-digit reductions in five of the eight serious crime categories, including aggravated assaults and robberies.
The project, finalized on February 12, provides the city with two different configurations of high-definition cameras to outfit 16 buses in the Pretzel City Area Transit fleet.
The funds will specifically reconstruct the portion of the pier used by PSTA’s Clearwater Ferry, creating a permanent dock for the ferry service, which serves as an important transportation and tourism link to other Pinellas County communities.