The work includes installing new engines, upgrading the transmissions and switching from hydraulic cooling to electric cooling systems. The electric system uses seven fans, which requires upgrading to 450-amp alternators.
Complete Coach Works (CCW) is about one-third of the way through a project with Orange County Transportation Authority (OCTA) to install new CNG engines and cooling systems along with upgrading the transmissions in 199 buses.
As of late December, 65 buses had been repowered at CCW’s Riverside location and returned to service in Orange County.
Ad Loading...
“The new CNG engines are more powerful and emit significantly less pollution,” said Kevin O'Brien, general sales manager for CCW. "CCW has been contracting work with OCTA for 30 years and this it is one of the most rewarding projects to date."
The work includes installing new engines, upgrading the transmissions and switching from hydraulic cooling to electric cooling systems. The electric system uses seven fans, which requires upgrading to 450-amp alternators.
OCTA destroys the old engines and provides documentation of that work to the South Coast Air Quality Management District, which in return provides funding to help pay for the project.
Now in its latest edition, the awards recognize forward-thinking solutions that improve safety, operational efficiency, sustainability, rider experience, and overall system performance.
Advances in data and analytics are giving transit agencies new opportunities to refine maintenance practices, improve efficiency and make more informed decisions about asset performance.
In Part 2 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his maintenance team’s work with various types of vehicle, training, augmented reality, and more.
In this Consultant Roundtable, Carmen C. Cham shares insights on how agencies can create spaces that are intuitive, connected and built for long-term impact.
The Siemens CBTC System, Trainguard MT, in compliance with New York Subway Interoperability Interface Specifications, enables trains to run as close as 90 seconds apart, using next-generation signaling and continuous communication to keep operations moving seamlessly.
Through the strategic partnership, MOIA America will provide MOIA’s turnkey autonomous mobility solution. This includes purpose-built, autonomous-ready ID. Buzz vehicles equipped with the self-driving system developed by Mobileye, as well as operator training and enablement.
Officials said the project delivers a fully integrated passenger environment featuring improved solar-powered LED lighting, real-time arrival information, and a precision-engineered shelter designed to withstand the Texas climate.
Two battery-electric buses entered service on Earth Day, with four additional vehicles expected to join the fleet this summer. Seven more buses are planned for the end of 2027, bringing Metro’s total zero-emission fleet to 13.