Topic : EIR/EIS

1 - 10 of 21 Previous Next

Georgia to Tenn. high-speed rail EIS gets Fed approval

Rail| October 2, 2017

The chosen corridor includes eight rail stations and is estimated to take 88 minutes of travel time from the first to last station along the corridor.

FTA, Maryland Transit Administration appeal judge's Purple Line decision

Rail| July 17, 2017

Ruling called for an additional environmental study of the light rail line, despite the fact the project had already been studied and signed-off on by the feds. 

Rail| December 14, 2015

Maryland Purple Line EIS receives FTA 'Outstanding Achievement' award

The MTA’s Purple Line is a 16-mile, 21-station light rail line in the northern Washington D.C. suburbs. A circumferential rail transit line linking an existing radial system, the Purple Line will connect key activity centers, four branches of the Washington Metropolitan Area Transit Authority system, and Amtrak’s Northeast Corridor.

Rail| June 17, 2015

Electro Wire connects rail industry with cable needs

Its facilities, automated equipment and lean manufacturing process reduce labor content and minimize waste resulting in significant cost savings for standard or custom cable assemblies, box builds or other electromechanical builds.

Rail| January 27, 2015

OCTA's streetcar project moves forward

The system is intended to provide “last-mile” transportation for individuals traveling from the transportation hubs to employment and retail and recreational areas in the heart of Orange County.

Bus| July 15, 2013

San Francisco MTA unveils TEP draft report

Initiatives under the TEP Draft Implementation Strategy include travel time reduction proposals, service changes and associated systemwide infrastructure, terminal and transfer points improvements, overhead wire expansion and long-term studies.
Rail| December 17, 2012

Md. MTA submits environmental statement to FTA

A favorable decision by the FTA would permit MTA to begin final engineering on the Red Line and move forward with acquiring property needed for construction.
Rail| August 22, 2012

L.A. light rail project releases eco report

Evaluates the impacts of the proposed 12.3-mile light rail extension from Azusa to Montclair, which includes six new stations and two new grade-separated crossings.
Rail| July 3, 2012

Environmental study planned for Northeast Corridor

Environmental Impact Statement to evaluate potential passenger rail improvements between Washington, D.C. and Boston.
Rail| June 20, 2012

FRA proposes eco-exclusions to expedite projects

Exclusions determined do not individually or cumulatively have significant effects on the human or natural environment so do not require the preparation of an environmental assessment or environmental impact statement under the National Environmental Policy Act.
PREV123NEXT

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation