Rail

STV joint venture renewed for Ottawa light rail expansion

Posted on June 8, 2016

O-Train
O-Train

The City of Ottawa awarded the STV/AECOM/Morrison Hershfield/McMillen Jacobs Associates joint venture a contract for the preliminary engineering and program management of the second stage of the transformative O-Train light rail transit extension program.

This $3 billion initiative includes the extension of three existing light rail routes — east and west along the Confederation Line and south along the Trillium Line — totaling approximately 18.64 miles of new rail and 19 new stations.

The program will seamlessly connect riders to employment nodes such as Tunney’s Pasture, Orléans Town Centre and Confederation Heights; academic institutions including University of Ottawa, Carleton University and Algonquin College; shopping centers such as Lincoln Fields, Rideau Centre, and Place d’Orléans; and cultural and recreational destinations like the National Arts Centre, the Rideau Canal, Parliament Hill and Westboro Beach.

The goal of Stage 2, which was approved unanimously by the Ottawa City Council in 2013, is to bring 70% of all city residents within 3.1 miles of rail transportation, leading to shorter commutes, cleaner air and a stronger economy.

“We are thankful for the opportunity to continue our support of the City of Ottawa as it demonstrates its ongoing commitment to meet the needs of its growing population through the addition of new transportation options,” said Keith Mackenzie, P.E., S.E., STV VP and program manager for the extensions. “The city’s O-Train extension program stands to have a profound effect on the region by creating new jobs and reducing vehicular congestion on the city’s roadway network.”

The joint venture team was previously awarded the preliminary engineering and program management services for the initial light rail transit project known as the Confederation Line, or Stage 1. This stage included new underground tunnels as well as conversion of a fully built-out bus rapid transit service into a light rail transit line, running from Tunney’s Pasture through downtown Ottawa to Blair Station.

The Trillium extension program will double the existing line’s ridership capacity with the addition of new passing sidings and functional enhancements at stations and maintenance facilities. Since it was introduced in 2001, ridership on the O-Train has nearly doubled to 12,000 trips per-day.

View comments or post a comment on this story. (0 Comments)

More News

Valley Link feasibility report approved by Calif. rail board

Phase 1 of the proposed rail service would cover 41 miles connecting the existing Dublin/Pleasanton BART Station to the proposed ACE North Lathrop Station.

NJ TRANSIT seeks partners to advance TOD projects near light rail

The 37-mile River LINE right-of-way includes 21 station areas across 15 municipalities.

N.Y. MTA report finds subway can speed up by as much as 50%

An agency task force initiated a study that would lead to faster trains while prioritizing customer and employee safety.

Metra's proposed 2020 budget includes $480M in capital spending

Funding will make major investments in locomotives and railcars, stations, bridges, and yards.

Alstom to supply 42 Metropolis trains for Barcelona Metro

The contract, valued at over $285 million, includes the design, manufacturing and commissioning of the trains.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation