Rail

FRA awards $25M in grants for PTC implementation

Posted on August 16, 2016

The Federal Railroad Administration (FRA) awarded $25 million in grants for 11 projects in six states and the District of Columbia to assist in implementing Positive Train Control (PTC).

The agency received 30 eligible applications requesting $90.6 million, nearly four times the $25 million Congress provided in the appropriations bill that funds FRA for Fiscal Year 2016. Many awards will help railroads achieve interoperability among the different PTC systems that railroads are deploying.

“These grants get us a bit closer to implementing Positive Train Control – a long overdue technology that prevents accidents and saves lives,” said U.S. Transportation Secretary Anthony Foxx. “We will continue to do everything in our power to help railroads install this technology. We encourage Congress to fully fund the President’s request for significant funds to help more railroads activate PTC.”

In 2008, Congress mandated PTC implementation on the main lines of Class I railroads and entities providing regularly scheduled intercity or commuter rail passenger transportation over which any poisonous or toxic by inhalation hazardous materials are transported, or over which intercity or commuter rail passenger transportation is regularly provided. Last October, Congress extended the original PTC implementation deadline from Dec. 31, 2015 to at least Dec. 31, 2018.

Metrolink
Metrolink
FRA awarded grants in the approximate amounts below to the following entities:
  • Metrolink – $2.4 million to develop, test, and deploy a full-feature service desk management suite of software applications that will allow each railroad to create, track, manage and share PTC system and asset trouble tickets internally within the organization and with interoperable railroad partners.
  • Sonoma-Marin Area Rail Transit District – $3 million to install PTC and integrated new grade crossing warning systems on the 2.1-mile passenger rail extension between downtown San Rafael and Larkspur, Calif.
  • Caltrain – $2.88 million to conduct two test procedures for the field integration and functional testing of Caltrain’s Interoperable-Incremental Train Control System (I-ITCS) that will allow Interoperable Electronic Train Management System (I-ETMS) equipped tenants to seamlessly operate on Caltrain’s tracks.
  • Amtrak – $2.64 million to put in place authentication technology to fully secure the PTC wireless communication and data transmittal between a train’s point of origin and targeted receivers on the Northeast Corridor.
  • American Short Line and Regional Railroad Assoc. – $2.5 million to create a Crew Initialization Back Office Server System (CI-BOS) hosted service to assist small railroads tasked with implementing PTC, particularly systems that interoperate with Class I railroads.
  • Providence and Worcester Railroad Co. (P&W) – $965,832 to acquire and install eight Advanced Civil Speed Enforcement System (ACSES) PTC onboard units for P&W’s locomotives utilized on Amtrak’s Northeast Corridor.
  • Twin Cities & Western Railroad Co. –$1.1 million to implement and test PTC systems, including a contract with a back office service and interoperability message software provider, initial activation and licensing fees of hosted back office systems, and two PTC equipped locomotives.
  • Missouri Department of Transportation – $3 million to jointly partner with the Terminal Railroad Association of St. Louis (TRRA) for an Interoperable Electronic Train Management System (I-ETMS) implementation project on the Missouri side of TRRA’s territory.
  • North Carolina Department of Transportation – $771,070 to equip five converted Cab Control Units with Interoperable Electronic Train Management System (I-ETMS) and conduct testing on the Piedmont corridor or within any adjacent rail territory of NCDOT’s rail partners (Norfolk Southern Corporation and Amtrak).
  • Capital Metropolitan Transportation Authority –$3 million to implement Enhanced Automatic Train Control (E-ATC) that will overlay the existing wayside signal system and enhance onboard, wayside, and control office equipment and software to create a functional PTC system in the Austin area.
  • Fort Worth & Western Railroad – $2.56 million to install PTC on-board equipment and 220 MHz radios on nine locomotives in a phased installation, develop a crew initialization back office server, and train necessary personnel to operate and maintain the PTC system.
View comments or post a comment on this story. (0 Comments)

More News

NJ TRANSIT seeks partners to advance TOD projects near light rail

The 37-mile River LINE right-of-way includes 21 station areas across 15 municipalities.

N.Y. MTA report finds subway can speed up by as much as 50%

An agency task force initiated a study that would lead to faster trains while prioritizing customer and employee safety.

Metra's proposed 2020 budget includes $480M in capital spending

Funding will make major investments in locomotives and railcars, stations, bridges, and yards.

Alstom to supply 42 Metropolis trains for Barcelona Metro

The contract, valued at over $285 million, includes the design, manufacturing and commissioning of the trains.

SacRT, UC Davis launch new renamed light rail station

The university is the second-largest employer in Sacramento County.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation