
The project includes either a rebuilt Cummins ISC 8.3 engine or a Detroit Series 50 EGR engine.
The project includes either a rebuilt Cummins ISC 8.3 engine or a Detroit Series 50 EGR engine.
The New Flyer bus will receive everything from a new engine to a fresh paint job under the new contract.
The project demonstrates a commitment by both institutions to provide safe and accessible transportation options and stimulate economic growth on the far southeast side of Chicago.
Will rebuild up to 121 Bombardier railcars operated by Metrolink for a total contract value of $138.9 million.
The program consists of completely rebuilding and refurbishing the F40 models with additional upgrades.
Will rehab 72 Gillig buses for Long Beach Transit, the second-largest public transit agency in Los Angeles County.
The new tunnels are the first part of the the multi-billion dollar Gateway Project, which includes building two new rail tunnels.
The contract, which includes repowering and repainting 30 artic buses, is expected to be completed this winter.
The revitalized station will serve as an economic anchor for the historic Uptown neighborhood by stimulating local business and promoting job growth.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In