Speed restrictions on the Tufts Curve were reduced to 10 mph in 2019. In the summer of 2022, the MBTA shut down the Orange Line for a 30-day period to complete critical track and signal upgrades.
Speed restrictions on the Tufts Curve were reduced to 10 mph in 2019. In the summer of 2022, the MBTA shut down the Orange Line for a 30-day period to complete critical track and signal upgrades.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In