D.C. Metro removes 100 railcars from service
Will inspect the operation of the car door motors, make repairs and return them to service.
As a precaution, Washington Metropolitan Area Transit Authority (Metro) officials removed 100 of its railcars from service to inspect the operation of the car door motors, make repairs and return them to service.
Between 60 and 70 of the 4000 series railcars are in service on an average weekday and all are expected to return to use within two to three weeks.
All 4,000 cars were removed from service at the end of Friday, July 2 to allow Metro's rail experts to address a possible short in the car door circuitry that could cause the doors to open while the cars are in motion. The removal of the cars was not prompted by a particular incident, but performance tests and observations conducted by Metro's operations staff. The cars are undergoing a rigorous inspection, repair and testing process.
"This is a precautionary and proactive action to ensure the highest level of safety for our riders," said Interim GM Richard Sarles.
Metro has been attempting to simulate an occurrence of the door openings in a controlled environment in a rail yard and were able to do so late this week. At that point the engineers, maintenance experts and quality control officials were able to identify the cause of the concern as well as the needed fix. The problem is within the circuitry of the cylindrical door motors, which are about a foot long and five inches wide. In total, the 100 railcars have 1,200 motors as each railcar has 12 individual doors.
Metro engineers and mechanics will be working around the clock to test and repair all 1,200 door motors. All of the motors will be removed, inspected, repaired, cleaned, reinstalled and retested. As the cars are repaired, they will be placed back into service. It is expected to take two to three weeks to complete the work on all of the motors.
More Rail

OCTA Declares Emergency to Protect Rail Corridor From Coastal Erosion
The California agency is accelerating shoreline protection and plans to place approximately 690,000 cubic yards of sand along the San Clemente coast to protect a key passenger and freight rail link.
Read More →
More Than a Summer Job: Building the Next Generation of Transit Talent
The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.
Read More →
Airo Trains Make Their Amtrak Cascades Debut in the Pacific Northwest
Effective immediately, two cutting-edge Airo trainsets will join the Amtrak Cascades route, operating four daily trips between Vancouver, B.C., Seattle, Portland, and Eugene, Oregon, marking the first introduction of Airo trains into passenger service anywhere in the country.
Read More →
Florida's Brightline Announces Financial Restructuring
Brightline Florida says train operations will continue as normal as certain parent entities enter Chapter 11 and financial stakeholders provide $490 million in new long-term capital.
Read More →
ENC Lands MATA Contract and More in Biz Briefs
In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.
Read More →
Strada360’s Steve Lassey on Turning Transit Data Into Better Decisions
From breaking down data silos to preparing for AI, Strada360 CEO Steve Lassey discusses how transit agencies can use technology to improve operations, customer information, and long-term decision-making.
Read More →
SEPTA Details Accelerate Vision for Transit System
The plan outlines investments in trolley modernization, new Metro and Regional Rail vehicles, accessible stations, and more frequent bus and rail service.
Read More →
FTA Ends Direct Oversight of MBTA Safety Actions
The federal agency closed its remaining special directive to the Massachusetts Department of Public Utilities following a safety review that began in 2022.
Read More →
Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety
The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.
Read More →
New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →