L.A.'s Metrolink moves forward with PTC installation
A $120 million contract was awarded to Parsons Transportation Group to manage and integrate positive train control technology on Metrolink's 512-mile system. Metrolink was the nation's first rail operator to get approval from the FRA on its PTC implementation plan.
On Oct. 2, at a special board meeting, the Metrolink Board of Directors authorized its CEO, John E. Fenton, to complete the final terms and conditions to award a $120 million contract to Parsons Transportation Group to manage and integrate Positive Train Control (PTC) technology on Metrolink's 512-mile system.
"Today's action puts us one step closer to our goal of being the first railroad to implement PTC and the safest rail operator in the nation," said Metrolink Board Chairman Keith Millhouse. "Metrolink has outlined an aggressive implementation schedule that will allow our passengers to be among the first in the nation to benefit from this safety innovation."
Metrolink was the nation's first rail operator to get approval from the Federal Railroad Administration on its PTC implementation plan.
PTC is collision avoidance technology that monitors and controls train movements remotely, and can prevent train-to-train collisions, unauthorized train movement into a work-zone, movement of a train through a switch left in the wrong position and trains exceeding authorized speeds. Metrolink's PTC system will consist of:
• PTC on-board computers, display screens, GPS tracking and radios on 57 cab cars and 52 locomotives
• Stop enforcement system at 476 signals wayside signals
• Six-county specialized communication system to link the wayside signals, trains and the centralized dispatch office
• Replacement of the current dispatch system with a new system and installation of PTC back office system
Parsons Transportation Group was selected through a competitive process to implement this advanced technology and integrate the various subsystems.
Metrolink's PTC system will be fully interoperable with the Union Pacific's and BNSF Railway's PTC Systems. The team will be supported by Wabtec Railway Electronics and ARINC.
More Rail

Southern California's Metrolink Debuts Contactless Fare Payment Pilot
Customers traveling between Redlands and Los Angeles can now tap their preferred payment method, including a credit or debit card, mobile wallet, or wearable device, at station validators before boarding and again while exiting.
Read More →
California's BART Approves FY27 Budget While Maintaining Service Levels
The budget covers July 1, 2026, through June 30, 2027, a period when pandemic emergency funds run out, the District faces a structural deficit of $375 million, and a regional transit funding measure may appear on the November ballot.
Read More →
Penn Station Transformation Advances with Design Unveiling
The historic redesign will transform the busiest transit hub in the Western Hemisphere from the tracks to the street level, creating a more efficient, cleaner, and functional experience for more than 600,000 daily commuters and millions of visitors.
Read More →
Second Avenue Subway Phase 2 Advances into Major Construction Stage
New York Governor Kathy Hochul joined leadership from the MTA, elected officials, and Harlem community leaders to break ground on the major construction stage of the transformative Second Avenue Subway Phase 2 project.
Read More →
The Invisible Infrastructure of Passenger Flow
What a seat reservation system on Austria’s Railjet trains reveals about the future of rider experience, and why U.S. agencies should pay attention.
Read More →
Caltrain Board Approves FY27 Budget, Endorses Efficiency Measures
The move ensures Caltrain service will continue operating as usual in the near term, but long-term financial challenges remain for the rail agency absent a new revenue source.
Read More →
Alstom Acquires Delaware Site to Support Amtrak NextGen Acela Fleet
The company is investing more than $55 million to acquire and improve the property and will employ approximately 100 people at this site once it is operational.
Read More →
When Routine Fails: How Public Transit Must Adapt for the World Cup
The 2026 FIFA World Cup will test transit agencies’ ability to manage unpredictable travel patterns, making real-time data and operational flexibility critical to moving millions of visitors efficiently.
Read More →
California Selects Team for Nation’s First True High-Speed Rail Track and Systems Contract
The board action follows completion of track installation at the 150-acre southern railhead in Kern County, which will serve as the staging and distribution hub for high-speed track and systems installation.
Read More →
Seattle's Sound Transit Launches New Sounder Railcars into Service
Alstom manufactured all the cars under a $46.5 million contract and came into service in anticipation of summer crowds for soccer and baseball.
Read More →