METRO Magazine Logo
MenuMENU
SearchSEARCH

Proterra Catalyst E2 sets world record, drives 1,101 miles on single charge

Proterra’s 40-foot Catalyst E2 max traveled 1,101.2 miles with 660 kWh of energy storage capacity. For the last three consecutive years, the company has demonstrated improved range and battery performance.

October 10, 2017
Proterra Catalyst E2 sets world record, drives 1,101 miles on single charge

Proterra.

2 min to read


Proterra.

Proterra recently set a world record for driving the longest distance ever traveled by an electric vehicle on a single charge at the Navistar Proving Grounds in New Carlisle, Ind.

Proterra’s 40-foot Catalyst E2 max traveled 1,101.2 miles with 660 kWh of energy storage capacity. For the last three consecutive years, the company has demonstrated improved range and battery performance. Last September, Proterra drove 603 miles with 440kWh of energy storage, and in 2015, drove 258 miles with 257kWh of energy storage on a single charge. This year’s world record range marks exceptional performance improvements over prior years and underscores the company’s commitment to innovation and accelerating the mass adoption of heavy-duty electric vehicles.

Ad Loading...

“For our heavy-duty electric bus to break the previous world record of 1,013.76 miles — which was set by a light-duty passenger EV 46 times lighter than the Catalyst E2 max — is a major feat,” said Matt Horton, Proterra’s chief commercial officer.

Beyond meeting transit agencies’ range requirements, the Catalyst E2 max is poised to make a significant impact on the transit market because of its low operational cost per mile compared to conventional fossil fuel powered buses.

According to Bloomberg New Energy Finance, lithium-ion battery prices have dropped by roughly 72% since 2010, and the economics for batteries continue to improve. Between li-ion battery cost savings and improving vehicle efficiency, electric vehicles represent the most disruptive mode of transport today.

Additionally, Proterra and LG Chem announced co-development of a battery cell that has been optimized to meet the unique performance and safety demands of the heavy-duty vehicle market. The cell chemistry has been optimized for exceptional energy throughput capability, high charge rate acceptance, and industry-leading energy density.

The joint development underscores the growing market demand for high-quality energy storage systems. According to Lux Research, batteries for transportation and grid storage are expected to surpass consumer electronics by next year and electric buses are cited as a primary market driver for this growing battery segment. Proterra’s new Burlingame battery production facility is currently ramping production to meet demand and can produce over 500 MWh of E2 battery packs on an annual basis.

Ad Loading...

Visit Proterra at the APTA Expo at Booth #9055

More Bus

paratransit bus
SponsoredMarch 16, 2026

Measuring the True Cost of Paratransit Fleets

What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.

Read More →
Cover photo for METROspectives with The Bus Coalition
Busby Alex RomanMarch 13, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
Cover photo for Biz Briefs dated March 6, 2026
Technologyby Staff and News ReportsMarch 6, 2026

Biz Briefs: Tolar Manufacturing Supports PSTA Spark Service and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Ad Loading...
Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Ad Loading...
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →
A Picture of Ster Seating's Parent/Child transit seating product.
Technologyby StaffFebruary 10, 2026

Ster Seating, Maryland Transit Launch First Parent/Child Transit Seat in North America

The configuration uses Ster Seating's Gemini seat platform to create a family-friendly floor layout specifically engineered to accommodate parents traveling with young children.

Read More →
Ad Loading...
Rendering of Sound Transit's Renton Transit Center
Busby StaffFebruary 5, 2026

Seattle’s Sound Transit Breaks Ground on New Transit Center

The Renton Transit Center project will relocate and rebuild the Renton Transit Center to better serve the regional Stride S1 line, local King County Metro services, and the future RapidRide I Line.

Read More →