METRO Magazine Logo
MenuMENU
SearchSEARCH

BYD delivers electric buses to Netherlands

The six-vehicle contract was awarded last June 2012 in Europe's first publicly tendered order for electric-powered full-size buses.

April 25, 2013
BYD delivers electric buses to Netherlands

 

2 min to read


BYD completed delivery of six electric buses for the Netherlands' first National Park in the province of Friesland, Netherlands.

The six vehicles, to be operated by regional bus service Arriva, recently entered service. The vehicle contract was awarded last June 2012 in Europe's first publicaly tendered order for electric-powered full-size buses.

Ad Loading...

BYD's Electric Bus model is a full-size, 40-foot transit bus, which can accommodate 60 to 70 passengers. Powered entirely by the company's advanced Iron Phosphate batteries, the buses can be charged at night and, with a range of approximatley 155 miles per charge, they can provide service all day without needing another charge, according to  company data.

The Friesland-based National Park has become one of the first places in Europe to entirely convert their public transportation to zero-emission, electric buses.

BYD has entered into a 15-year maintenance contract to support the buses in service and will be employing locally recruited mechanics to undertake the work.

BYD electric bus features:

  • The specially designed wheel-hub motor and the electronically controlled air suspension give the BYD ebus an exceptionally low floor and ample door and floor space for easy disabled and elderly passenger access.

  • The front windscreen occupies two/thirds of the frontal area of the bus for maximum viewing and safety. The bus body conveys an elegant exterior image, while the interior boasts adjustable leather drivers seating, high-quality leather seats for passengers and a carefully engineered sound insulation keeping the interior ride whisper quiet.

Ad Loading...
  • BYD's first pure electric bus also employs many advanced technologies. The Iron-phosphate or "Fe Battery" used on the BYD ebus is non-polluting: the materials contained in the battery can be recycled or easily disposed of.

  • The bus has no direct emissions, very low noise, regenerative braking, full AC charging in five hours.

More Bus

Cover of METROspectives episode with The Bus Coalition
BusMarch 20, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
County and agency officials break ground in front of a red and yellow King County Metro public transit bus.
Busby StaffMarch 20, 2026

Seattle’s King County Breaks Ground on RapidRide I Line to Expand High-Capacity Transit

The 17-mile RapidRide I Line will bring faster, more frequent service and improved regional connections across South King County.

Read More →
paratransit bus
SponsoredMarch 16, 2026

Measuring the True Cost of Paratransit Fleets

What truly drives the cost of a paratransit fleet? Beyond the purchase price, seven operational factors quietly determine maintenance frequency, downtime, and long-term service reliability. This whitepaper explores how these factors shape lifecycle cost and what agencies should evaluate when selecting paratransit vehicles.

Read More →
Ad Loading...
Cover photo for METROspectives with The Bus Coalition
Busby Alex RomanMarch 13, 2026

Inside The Bus Coalition’s Push for Stronger Federal Transit Investment

In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.

Read More →
Cover photo for Biz Briefs dated March 6, 2026
Technologyby Staff and News ReportsMarch 6, 2026

Biz Briefs: Tolar Manufacturing Supports PSTA Spark Service and More

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Passengers boarding a PRT bus
Busby StaffMarch 2, 2026

Pittsburgh Unveils 'Bus Line Refresh' Plan

Originally introduced in 2023 as the Bus Line Redesign, the effort has evolved into a more targeted update that maintains familiar routes while improving reliability, frequency, evening and weekend service, and connections across Allegheny County.

Read More →
Ad Loading...
Stickers and a paper bus for S3 bus line
Busby StaffMarch 2, 2026

Seattle's Sound Transit Breaks Ground on S3 Bus Line

S3 will connect communities along SR 522 with fast, reliable, battery-electric bus service from Shoreline South Station to Bothell via Kenmore and Lake Forest Park. 

Read More →
PRT bus stop with articulated bus.
Busby StaffFebruary 20, 2026

Pittsburgh Regional Transit Announces All-Door Boarding on the University Line

All-door boarding will allow passengers to pay while entering the front, middle, or rear doors of the University Line’s 60-foot articulated buses.

Read More →
Patrick Scully, president at Complete Coach Works.
Managementby StaffFebruary 18, 2026

Complete Coach Works Names Patrick Scully President

He succeeds the company founder, Dale Carson, who remains chairman of the board. 

Read More →
Ad Loading...
A MARTA articulated bus.
Busby StaffFebruary 13, 2026

Atlanta's MARTA Sets Date for 'A-Line' BRT Launch

The five-mile Rapid A-Line connects Downtown Atlanta to Capitol Gateway, Summerhill, Peoplestown, and the Beltline’s Southside Trail.

Read More →