METRO Magazine Logo
MenuMENU
SearchSEARCH

San Francisco MTA launches 2nd tunnel boring machine

In the coming months, the two machines will travel north under 4th Street, Stockton Street and Columbus Avenue, excavating and constructing San Francisco’s first new subway line in decades.

November 20, 2013
3 min to read


The San Francisco Municipal Transportation Agency (SFMTA) launched its second tunnel boring machine to help construct the Central Subway project.

Big Alma, as the second tunnel boring machine (TBM) is called, is joining her twin, Mom Chung to construct two Central Subway tunnels. The tunnels will allow the T Third Line trains to travel quickly beneath SoMa, Union Square and Chinatown when the Central Subway opens, cutting travel times by more than one-half along this busy corridor.

Ad Loading...

RELATED: (video) "How a Tunnel-Boring Machine Drills Underground."

Like Mom Chung, Big Alma is 350 feet long and weighs 750 tons. In the coming months, the two machines will travel north under 4th Street, Stockton Street and Columbus Avenue, excavating and constructing San Francisco’s first new subway line in decades.

The two machines will keep some distance between them as they move forward. Currently they are about 1,800 feet apart, with Big Alma under 4th and Harrison and Mom Chung near 4th and Mission.

“Today we are another big step closer to building the 21st century transportation system our world-class city needs and deserves,” said Mayor Edwin M. Lee. “The Central Subway and the tunnels we are excavating today are essential to our vision and crucial to building and maintaining a reliable, modern public transportation system for San Francisco residents and visitors.”

The TBMs will excavate and construct the 1.5-mile-long tunnels at an average pace of 40 feet per day, though their pace will vary based on ground conditions and other factors. Big Alma will move more slowly during the first 500 feet of tunneling, as Central Subway crews test the TBM and calibrate its many functions.

Ad Loading...

Big Alma is named for “Big Alma” de Bretteville Spreckels, a wealthy 19th century socialite and philanthropist who, among her many accomplishments, persuaded her first husband, sugar magnate Adolph B. Spreckels, to fund the design and construction of the California Palace of the Legion of Honor, at Land’s End in San Francisco. A model in her youth, Spreckels was the inspiration for the “Victory” statue atop the Dewey Monument in the center of Union Square.

Each TBM consists of a rotating cutter wheel (the cutter head), a cylindrical steel shell (the shield) and a 300-foot train of tunnel-building mechanisms (the trailing gear). The cutter head, a spinning excavator at the front of the machine, pumps out an environmentally safe, soap-like foam to condition the ground as it cuts through the earth like a cheese grater. Once loosened, spoils pass through holes in the cutter head and onto a large screw. The screw carries the spoils onto a series of conveyors for transport out of the tunnel.

To launch, Big Alma pushed off of a steel frame as her cutter head began to spin. As Big Alma tunnels, the machine will stop every five feet to install the concrete segments that make up the tunnel’s lining. The concrete segments are installed within the back of the TBM’s cylindrical shield. The machine lifts the segments into place, and then crews bolt them together. Hydraulic jacks within the shield then push off of the newly installed tunnel lining, propelling the massive machine forward. A crew of about 10 people operates each machine and bolts concrete tunnel segments together.

The Central Subway is expected to open to the public in 2019.

More Rail

A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
Ad Loading...
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →
A Caltrain electric railcar on the tracks
Rail•by Alex Roman•October 27, 2026

Caltrain’s Electrification Drives a New Era of Ridership Growth

The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.

Read More →
Ad Loading...
METRO Magazine graphic featuring a dark blue background with abstract curved lines and the headline “FTA Advances $164M Broward County Commuter Rail Project.”
Rail•by Staff and News Reports•October 26, 2026

FTA Advances $164M Broward County Commuter Rail Project

The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.

Read More →
An A line MTA subway car near the soon to be replaced signaling system.
Rail•by Staff and News Reports•October 23, 2026

New York MTA Launches Historic $1.9B Signal, Track Modernization Project

Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.

Read More →
The LA Metro San Fernando Valley light rail extension corridor
Rail•by Alex Roman•October 20, 2026

LA Metro Breaks Ground on East San Fernando Valley Light Rail Project

The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.

Read More →
Ad Loading...
New Standard Helps Transit Agencies Address Climate Risks
Security and Safety•by Alex Roman•October 19, 2026

CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail

Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.

Read More →