METRO Magazine Logo
MenuMENU
SearchSEARCH

Southern Calif. Amtrak, transit agencies launch free transfer program

The Pacific Surfliner transit transfer program provides free connections between 23 daily Pacific Surfliner trains and 12 local transit providers along a 351-mile route in the counties of San Diego, Orange, Los Angeles, Ventura, Santa Barbara and San Luis Obispo.

June 22, 2016
Southern Calif. Amtrak, transit agencies launch free transfer program

King of Hearts

2 min to read


King of Hearts

Passengers on the Amtrak Pacific Surfliner service in Southern California can now make free transfers to 12 connecting public transit providers thanks to a new program introduced by the Los Angeles – San Diego – San Luis Obispo (LOSSAN) Rail Corridor Agency.

The Pacific Surfliner transit transfer program provides free connections between 23 daily Pacific Surfliner trains and 12 local transit providers along a 351-mile route in the counties of San Diego, Orange, Los Angeles, Ventura, Santa Barbara and San Luis Obispo.

Ad Loading...

The program is being launched as a one-year pilot project and is funded by a $1.7 million cap and trade grant received from the California State Transportation Agency (CalSTA) through the state’s Transit and Intercity Rail Capital Program.

“The cost and inconvenience of having to purchase a separate fare to use connecting bus services are deterrents to choosing public transit,” said CalSTA Secretary Brian Kelly. “People want more convenient travel options. This program makes using transit an easier alternative, resulting in fewer cars on the road and reduced greenhouse gas emissions.”

Public transit providers participating in the free transfer program include (north to south): San Luis Obispo Regional Transit Authority, City of San Luis Obispo Transit, South County Transit (San Luis Obispo County), Guadalupe Flyer, Santa Barbara Metropolitan Transit District, Ventura County Transportation Commission Intercity Bus, Gold Coast Transit (Ventura County), Glendale Beeline, Anaheim Resort Transportation, Orange County Transportation Authority, iShuttle (Irvine) and North County Transit District.

In addition, beginning June 22, Pacific Surfliner passengers can purchase discounted one-day transit passes for the Los Angeles County Metropolitan Transportation Authority and San Diego Metropolitan Transit System, which will be sold onboard the train in the café car.

The Pacific Surfliner is the second busiest Amtrak corridor in the nation, serving 2.8 million annual passengers. The LOSSAN Agency is a joint powers authority composed of rail owners, operators and planning agencies along the entire LOSSAN rail corridor. The LOSSAN Agency assumed management responsibility for the Pacific Surfliner service in July 2015, following the execution of an interagency transfer agreement with the state of California.

More Rail

A photo of an Amtrak train with a logo
Railby Staff and News ReportsSeptember 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
Ad Loading...
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
Ad Loading...
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
Ad Loading...
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →