METRO Magazine Logo
MenuMENU
SearchSEARCH

FRA awards $25M in grants for PTC implementation

The agency received 30 eligible applications requesting $90.6 million, nearly four times the $25 million Congress provided in the appropriations bill that funds FRA for Fiscal Year 2016.

August 16, 2016
FRA awards $25M in grants for PTC implementation

 

3 min to read


The Federal Railroad Administration (FRA) awarded $25 million in grants for 11 projects in six states and the District of Columbia to assist in implementing Positive Train Control (PTC).

The agency received 30 eligible applications requesting $90.6 million, nearly four times the $25 million Congress provided in the appropriations bill that funds FRA for Fiscal Year 2016. Many awards will help railroads achieve interoperability among the different PTC systems that railroads are deploying.

Ad Loading...

“These grants get us a bit closer to implementing Positive Train Control – a long overdue technology that prevents accidents and saves lives,” said U.S. Transportation Secretary Anthony Foxx. “We will continue to do everything in our power to help railroads install this technology. We encourage Congress to fully fund the President’s request for significant funds to help more railroads activate PTC.”

In 2008, Congress mandated PTC implementation on the main lines of Class I railroads and entities providing regularly scheduled intercity or commuter rail passenger transportation over which any poisonous or toxic by inhalation hazardous materials are transported, or over which intercity or commuter rail passenger transportation is regularly provided. Last October, Congress extended the original PTC implementation deadline from Dec. 31, 2015 to at least Dec. 31, 2018.

Metrolink

FRA awarded grants in the approximate amounts below to the following entities:

  • Metrolink – $2.4 million to develop, test, and deploy a full-feature service desk management suite of software applications that will allow each railroad to create, track, manage and share PTC system and asset trouble tickets internally within the organization and with interoperable railroad partners.

  • Sonoma-Marin Area Rail TransitDistrict – $3 million to install PTC and integrated new grade crossing warning systems on the 2.1-mile passenger rail extension between downtown San Rafael and Larkspur, Calif.

  • Caltrain – $2.88 million to conduct two test procedures for the field integration and functional testing of Caltrain’s Interoperable-Incremental Train Control System (I-ITCS) that will allow Interoperable Electronic Train Management System (I-ETMS) equipped tenants to seamlessly operate on Caltrain’s tracks.

  • Amtrak – $2.64 million to put in place authentication technology to fully secure the PTC wireless communication and data transmittal between a train’s point of origin and targeted receivers on the Northeast Corridor.

  • American Short Line and Regional Railroad Assoc. – $2.5 million to create a Crew Initialization Back Office Server System (CI-BOS) hosted service to assist small railroads tasked with implementing PTC, particularly systems that interoperate with Class I railroads.

  • Providence and Worcester Railroad Co. (P&W) – $965,832 to acquire and install eight Advanced Civil Speed Enforcement System (ACSES) PTC onboard units for P&W’s locomotives utilized on Amtrak’s Northeast Corridor.

  • Twin Cities & Western Railroad Co. –$1.1 million to implement and test PTC systems, including a contract with a back office service and interoperability message software provider, initial activation and licensing fees of hosted back office systems, and two PTC equipped locomotives.

  • Missouri Department of Transportation – $3 million to jointly partner with the Terminal Railroad Association of St. Louis (TRRA) for an Interoperable Electronic Train Management System (I-ETMS) implementation project on the Missouri side of TRRA’s territory.

  • North Carolina Department of Transportation – $771,070 to equip five converted Cab Control Units with Interoperable Electronic Train Management System (I-ETMS) and conduct testing on the Piedmont corridor or within any adjacent rail territory of NCDOT’s rail partners (Norfolk Southern Corporation and Amtrak).

  • Capital Metropolitan Transportation Authority –$3 million to implement Enhanced Automatic Train Control (E-ATC) that will overlay the existing wayside signal system and enhance onboard, wayside, and control office equipment and software to create a functional PTC system in the Austin area.

  • Fort Worth & Western Railroad – $2.56 million to install PTC on-board equipment and 220 MHz radios on nine locomotives in a phased installation, develop a crew initialization back office server, and train necessary personnel to operate and maintain the PTC system.

More Rail

MTA Advances Accessibility Improvements in Brooklyn
Paratransitby StaffJune 17, 2026

New York MTA Leverages Zoning Program to Advance Station Accessibility

Accessibility enhancements at Nevins St Station will be financed through a development agreement tied to the MTA's Zoning for Accessibility initiative.

Read More →
Six-Year Plan Boosts Virginia Transit, Rail Investments
Managementby StaffJune 17, 2026

Virginia's $28.5B Transportation Plan Targets Transit and Rail

Approved by the Commonwealth Transportation Board, the program supports ongoing infrastructure projects while providing new investments in transit, state of good repair and transportation alternatives.

Read More →
Security and Safetyby StaffJune 16, 2026

DOT: Brightline Corridor Incidents Fall 30% Following Federal Safety Upgrades

Safety improvements funded through a $25 million federal investment are credited with reducing trespassing and train-vehicle collisions along the Brightline Florida corridor.

Read More →
Ad Loading...
An LA Metro D Line train in Union Station
Managementby StaffJune 16, 2026

D Line Expansion Fuels Growth Across LA Metro's Rail System

Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.

Read More →
A user demonstrating Metrolink's contactless fare payment pilot.
Technologyby StaffJune 12, 2026

Southern California's Metrolink Debuts Contactless Fare Payment Pilot

Customers traveling between Redlands and Los Angeles can now tap their preferred payment method, including a credit or debit card, mobile wallet, or wearable device, at station validators before boarding and again while exiting.

Read More →
A BART train on the tracks.
Managementby StaffJune 12, 2026

California's BART Approves FY27 Budget While Maintaining Service Levels

The budget covers July 1, 2026, through June 30, 2027, a period when pandemic emergency funds run out, the District faces a structural deficit of $375 million, and a regional transit funding measure may appear on the November ballot.

Read More →
Ad Loading...
A rendering of the Amtrak New York Penn Station renovation
Railby StaffJune 9, 2026

Penn Station Transformation Advances with Design Unveiling

The historic redesign will transform the busiest transit hub in the Western Hemisphere from the tracks to the street level, creating a more efficient, cleaner, and functional experience for more than 600,000 daily commuters and millions of visitors.

Read More →
Groundbreaking event for Second Avenue Subway Phase 2 TBM construction.
Railby StaffJune 9, 2026

Second Avenue Subway Phase 2 Advances into Major Construction Stage

New York Governor Kathy Hochul joined leadership from the MTA, elected officials, and Harlem community leaders to break ground on the major construction stage of the transformative Second Avenue Subway Phase 2 project.

Read More →
A man sits in a passenger rail seat and looks at his phone.
Railby Elora HaynesJune 8, 2026

The Invisible Infrastructure of Passenger Flow

What a seat reservation system on Austria’s Railjet trains reveals about the future of rider experience, and why U.S. agencies should pay attention.

Read More →
Ad Loading...
Aerial view of Caltrain's electric service.
Railby StaffJune 5, 2026

Caltrain Board Approves FY27 Budget, Endorses Efficiency Measures

The move ensures Caltrain service will continue operating as usual in the near term, but long-term financial challenges remain for the rail agency absent a new revenue source.

Read More →