Alstom to supply Shanghai metro with traction, train control monitoring
Line 10 includes two phases: phase one, which started revenue service in 2010, is around 23.4 miles long with 31 stations, and phase 2, which will add around 6.2 miles and 6 stations

Photo credit: Alstom

Photo
Alstom
Alstom has been awarded a contract worth approximately $33 million to supply traction systems (including auxiliary systems) and train control monitoring systems (TCMS) for 156 metro cars of the Shanghai line 10 phase 2. The line is expected to start revenue service in 2018.
Line 10 is one of the first driverless metro lines in Shanghai. It includes two phases: phase one, which started revenue service in 2010, is around 23.4 miles long with 31 stations, and phase 2, which will add around 6.2 miles and 6 stations. Alstom supplied the signaling and traction systems, including auxiliary system TCMS for the first phase and was also involved in the design of the metro.
All traction systems and TCMS for phase 2 will be manufactured by Alstom’s local joint venture (JV), Shanghai Alstom Transport Electrical Equipment Co. Ltd., with motors manufactured by another Alstom local JV: Xi’an Alstom Yongji Electric Equipment Co. Alstom Tarbes and Villeurbanne sites in France will provide components. Alstom's Sesto site in Italy, Charleroi in Belgium, and Valenciennes in France will provide software for the traction, auxiliary converter, and TCMS system.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →