Siemens, partners deliver automated peoplemover for Frankfurt Airport
The company will deliver 12 fully automated two-car trains equipped with GoA4 Communication Based Train Control Trainguard MT CBTC, the track work equipment, the station platform doors, communication system, depot equipment, and the power supply system.
The Airval is a fully automated passenger transport system running on rubber tires and using a central rail guidance system. It offers high performance with short headways and is fitted with an energy management system that ensures high operating efficiency.
Siemens
2 min to read
The Airval is a fully automated passenger transport system running on rubber tires and using a central rail guidance system. It offers high performance with short headways and is fitted with an energy management system that ensures high operating efficiency.
Siemens
Fraport AG, operator of the Frankfurt Airport, commissioned Siemens, lead in a consortium with Max Bögl Group and Keolis Deutschland GmbH & Co. KG, to deliver a fully automated Airval peoplemover. The Airval will connect the Terminal 2 with the new Terminal 3 and the Station at Terminal 1. The line will be approximately 3.5 miles long, and have two tracks and three stations.
Siemens will deliver 12 fully automated two-car trains equipped with GoA4 Communication Based Train Control Trainguard MT CBTC, the track work equipment, the station platform doors, communication system, depot equipment, and the power supply system. In addition, Siemens will take over the operation and maintenance of the system for five years with an option to extend service for another five years. The Airval system will be designed and developed at Siemens' Val world center of competence in Toulouse, France.
Ad Loading...
The fully automated people mover is scheduled to begin service at the Frankfurt Airport in 2023.
The Airval is a fully automated passenger transport system running on rubber tires and using a central rail guidance system. It offers high performance with short headways and is fitted with an energy management system that ensures high operating efficiency.
The Airval trains will operate at the Frankfurt Airport with two-minute headway, 24-hours a day and seven days a week. In peak periods, the trains in Frankfurt can carry over 4,000 passengers per hour and per direction. The trains have a top speed of approximately 49 mph, while large doors and spacious aisles ease entries and exits and provide generous space for baggage. On-board Internet access and information displays enhance passenger comfort and convenience.
Val systems from Siemens are already operating at the Roissy Charles-de-Gaulle and Orly Airports in Paris as well as at the O'Hare Airport in Chicago. Val systems also operate as metro lines, such as in the French cities of Lille, Rennes, and Toulouse; in Uijeongbu, South Korea; and in Turin, Italy.
HDR’s transit program management lead discusses the challenges of overseeing large capital projects, adapting to cost and supply chain pressures, and the capabilities agencies need to build for the future.
Operation Lifesaver and the FHWA awarded nearly $198,000 in grants to 10 state programs for rail safety education campaigns focused on crossing safety, trespass prevention, and public awareness initiatives.
Garo Hovnanian explores how agencies can better navigate competing priorities, strengthen decision-making, and prepare for a future shaped by electrification and emerging mobility.
See what deregulatory rail rules were finalized to reduce outdated requirements, support innovation, and streamline rail operations without compromising safety.
The plan includes investments in cleaner vehicles and upgraded stations, NJT LiveView to provide real-time GPS tracking of train and light rail service, enhanced safety initiatives through a new Real Time Crime Center, and the debut of a redesigned NJ TRANSIT mobile app.
The only new subway opening in the US this year, the D Line Extension represents one of Metro’s top transit priorities and a historic milestone for Los Angeles, with Sections 2 and 3 set to open in 2027.