Siemens, partners deliver automated peoplemover for Frankfurt Airport
The company will deliver 12 fully automated two-car trains equipped with GoA4 Communication Based Train Control Trainguard MT CBTC, the track work equipment, the station platform doors, communication system, depot equipment, and the power supply system.
The Airval is a fully automated passenger transport system running on rubber tires and using a central rail guidance system. It offers high performance with short headways and is fitted with an energy management system that ensures high operating efficiency.
Siemens
2 min to read
The Airval is a fully automated passenger transport system running on rubber tires and using a central rail guidance system. It offers high performance with short headways and is fitted with an energy management system that ensures high operating efficiency.
Siemens
Fraport AG, operator of the Frankfurt Airport, commissioned Siemens, lead in a consortium with Max Bögl Group and Keolis Deutschland GmbH & Co. KG, to deliver a fully automated Airval peoplemover. The Airval will connect the Terminal 2 with the new Terminal 3 and the Station at Terminal 1. The line will be approximately 3.5 miles long, and have two tracks and three stations.
Siemens will deliver 12 fully automated two-car trains equipped with GoA4 Communication Based Train Control Trainguard MT CBTC, the track work equipment, the station platform doors, communication system, depot equipment, and the power supply system. In addition, Siemens will take over the operation and maintenance of the system for five years with an option to extend service for another five years. The Airval system will be designed and developed at Siemens' Val world center of competence in Toulouse, France.
Ad Loading...
The fully automated people mover is scheduled to begin service at the Frankfurt Airport in 2023.
The Airval is a fully automated passenger transport system running on rubber tires and using a central rail guidance system. It offers high performance with short headways and is fitted with an energy management system that ensures high operating efficiency.
The Airval trains will operate at the Frankfurt Airport with two-minute headway, 24-hours a day and seven days a week. In peak periods, the trains in Frankfurt can carry over 4,000 passengers per hour and per direction. The trains have a top speed of approximately 49 mph, while large doors and spacious aisles ease entries and exits and provide generous space for baggage. On-board Internet access and information displays enhance passenger comfort and convenience.
Val systems from Siemens are already operating at the Roissy Charles-de-Gaulle and Orly Airports in Paris as well as at the O'Hare Airport in Chicago. Val systems also operate as metro lines, such as in the French cities of Lille, Rennes, and Toulouse; in Uijeongbu, South Korea; and in Turin, Italy.
Funding for the purchase of the railcars comes from the nearly $220 million in additional capital dollars Gov. Josh Shapiro allocated in November 2025 to support urgent safety upgrades and infrastructure improvements.
With major events and increased travel expected across the state this summer, the Administration is focused on making sure people have a reliable, affordable alternative to driving so we can reduce congestion, support daily commuters, and keep Massachusetts moving.
The final seven-mile segment of the 2 Line includes new stations at Mercer Island and Judkins Park and connects to the 1 Line at the International District/Chinatown Station. The Link light rail system now spans 63 miles and includes 50 stations.
From March 29 through May 9, shuttle buses will replace train service between Bridgeport Station and Norristown Transit Center. Train service will operate as normal between Bridgeport Station and 69th Street Transit Center.
Nadine S. Lee, who has served as president/CEO since July 2021, said the decision comes after careful reflection on the agency’s progress and its path forward.
In this edition of Biz Briefs, we highlight the latest developments shaping the future of mobility — from manufacturers and technology providers to transit agencies and motorcoach service operators.
As part of the contract, the AECOM-LiRo NYPennT Joint Venture will work with Amtrak and the selected Master Developer to completely transform Penn Station, improving safety and operational efficiency, making the system more family-friendly, accommodating increased train and passenger capacity, and delivering a world-class experience to its growing passenger base, according to Amtrak officials.