METRO Magazine Logo
MenuMENU
SearchSEARCH

Stantec designs first bus rapid transit line to open in Calgary

New multimodal corridor connects more than 60,000 residents and 400 businesses to downtown.

January 4, 2019
Stantec designs first bus rapid transit line to open in Calgary

With hundreds of businesses located along the 17 Avenue corridor, a median running transitway was selected to optimize the transit operations and minimize bus/vehicle conflicts (looking eastbound at 44 Street SE). Photo: Jaime Vedres

2 min to read


With hundreds of businesses located along the 17 Avenue corridor, a median running transitway was selected to optimize the transit operations and minimize bus/vehicle conflicts (looking eastbound at 44 Street SE). Photo: Jaime Vedres

Calgary’s first dedicated Bus Rapid Transit (BRT) corridor, called MAX Purple, is now open and serving the community. The design, led by Stantec, has transformed the corridor into a multimodal street with a strong focus on the needs of pedestrians, and transit, while still accommodating high volumes of traffic.

MAX Purple, which has transformed two miles of 17 Avenue SE, will provide Calgarians with a significant improvement in the speed and reliability of transit operations in the corridor, as well as a safer pedestrian experience. The connection of 17 Avenue SE to the City’s downtown has been enhanced by one mile of dedicated facility that provides a direct connection for pedestrians, cyclists and transit. The project was led by the City of Calgary with funding from the Alberta and Federal Governments.

Ad Loading...
Stantec worked with GEC Architecture to design stations using a “kit of parts” approach, allowing the same components to be used on a variety of scales of stations across the City’s BRT system. The MAX Purple stations include heated shelters, real-time information, security and future allowances for off board fare payment. Photo: Jaime Vedres

Calgary’s 17 Avenue SE has historically had a significant number of pedestrians and transit customers, though the facilities to accommodate them were in need of enhancement. Narrow sidewalks were widened, and a buffer was added between the pedestrian realm and the roadway. In Phase I of the route, the BRT travels along a median transitway through the International Avenue business district — home to more than 400 businesses. The full length of the MAX Purple Line is home to 60,000 Calgary residents.

Phase 2 of MAX Purple is a dedicated facility that runs parallel to 17 Avenue and includes one mile of pathway that pass over the WID Canal, Deerfoot Trail, and the Bow River, providing several direct connections to the City’s extensive pathway system. Initial plans have also been developed to offer dedicated on-street bike accommodation on the parallel corridors.

The new transitway bridge over Deerfoot Trail has been designed to allow for potential future conversion to LRT (looking west towards downtown Calgary). Photo: Jaime Vedres

While the project utilized traditional engagement sessions to consult the community, the Stantec team went a step further by also attending unannounced pop-up events at key community locations and drop-in storefronts with extended hours to accommodate the diverse schedules of community businesses and stakeholders.

MAX Purple is one of three new lines for the City of Calgary’s BRT. This project will serve as an example for other jurisdictions in Canada on how to cost-effectively enhance transit while improving the public realm.

Topics:Bus

More Bus

A Nova LFSe+ electric bus for STM
Technologyby Staff and News ReportsJune 18, 2026

Biz Briefs: Montréal Debuts Nova Electric Buses and More

In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.

Read More →
Zero-emissions bus with FLEETWATCH technology
ManagementJune 17, 2026

The Hidden Cost of Fuel Data Inaccuracy in Public Transit Fleets

In today's transit environment, accurate fuel and mileage data are critical to reducing costs, minimizing downtime, and improving fleet performance.

Read More →
Six-Year Plan Boosts Virginia Transit, Rail Investments
Managementby StaffJune 17, 2026

Virginia's $28.5B Transportation Plan Targets Transit and Rail

Approved by the Commonwealth Transportation Board, the program supports ongoing infrastructure projects while providing new investments in transit, state of good repair and transportation alternatives.

Read More →
Ad Loading...
Group announcing BUSES Act
Motorcoachby StaffJune 16, 2026

Bipartisan BUSES Act Seeks Changes to New York City's Bus Idling Enforcement Program

Backed by motorcoach operators, the legislation seeks to balance emissions goals with passenger safety by allowing limited idling for inspections, accessibility needs and extreme weather conditions.

Read More →
An LA Metro D Line train in Union Station
Managementby StaffJune 16, 2026

D Line Expansion Fuels Growth Across LA Metro's Rail System

Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.

Read More →
An ENC bus being manufactured in its facility.
Busby StaffJune 10, 2026

ENC to Deliver Three Clean Diesel Buses to Canada's York Region Transit

Since 2005, City View and ENC have supplied nearly 90 E-Z Rider II buses to YRT.

Read More →
Ad Loading...
Frontrunner's new facility in Billerica, Massachusetts.
Busby StaffJune 8, 2026

Frontrunner Bus Group Expands with New Massachusetts Headquarters

The significantly larger facility will provide the infrastructure needed to support the company’s growing workforce, advanced technologies, and expanding product line.

Read More →
New MobilityJune 5, 2026

Joshua Schank on Transportation Innovation, Risk, and the Future of Mobility

In this edition of METROspectives, Joshua Schank discusses lessons from launching LA Metro’s Office of Extraordinary Innovation, the challenges of advancing new mobility technologies, and much more.

Read More →
A maintenance person with a tablet.
ManagementJune 5, 2026

Reinventing Fleet Maintenance with Real-time Visibility and AI

Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.

Read More →
Ad Loading...
SamTrans planning for ballot measure
Managementby StaffJune 4, 2026

SamTrans Sets Priorities for Potential Connect Bay Area Revenue

The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.

Read More →