Officials start Phase 2 of midwest high-speed rail route
Work on the Chicago-to-St. Louis route includes the installation of new premium rail with concrete ties and stone ballast; upgrades to bridges, culverts and drainage; signal and wayside equipment installations and upgrades; and roadway-rail grade crossing improvements.
The Illinois Department of Transportation and Union Pacific Railroad are performing the second of three phases of 2013 upgrades to Illinois’ signature high-speed route, Chicago-St. Louis, for future 110 mph operation of Amtrak Lincoln Service trains.
The construction work includes the installation of new premium rail with concrete ties and stone ballast; upgrades to bridges, culverts and drainage; signal and wayside equipment installations and upgrades; and roadway-rail grade crossing improvements.
For seven days starting September 16, bridge and culvert upgrades south of Bloomington-Normal will lead Amtrak to charter buses for Lincoln Service (Trains 300-307) passengers at St. Louis, Alton, Carlinville, Springfield and Lincoln.
The infrastructure improvements will enable Amtrak to operate service at speeds up to 110 mph in the future, an increase from the current maximum of 79 mph in effect over most of the route.
Starting last Thanksgiving, the Dwight to Pontiac segment became the first part of the corridor to regularly experience trains traveling at speeds up to 110 mph.
In the 10 months since October 2012 (Amtrak Fiscal Year 2013), ridership on the Chicago-St. Louis corridor has increased by nearly 52,000 when compared with the same period-a year ago, totaling nearly 627,000 passengers–an increase of nine percent that sets the stage to break the record of 675,295 set last year.
Totals will be available by mid-October. Temporary road crossing closures due to construction are updated on a nightly basis on the Official Illinois High-Speed Rail Chicago to St. Louis Project.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →