METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom lands $114M order for 25 Coradia Lint trains

All the Coradia Lint DMUs will be manufactured in Salzgitter, Germany, at Alstom’s biggest production site, worldwide.

April 2, 2018
Alstom lands $114M order for 25 Coradia Lint trains

The two-part Coradia Lint trains feature a seating capacity of 150 passengers and 18 bicycle parking spaces.

Alstom

2 min to read


The two-part Coradia Lint trains feature a seating capacity of 150 passengers and 18 bicycle parking spaces. Alstom

Alstom received two orders for the supply of a total of 25 Coradia Lint regional trains in southern Germany. DB Regio Bayern has ordered 20 trains, totaling approximately $114 million, while Hohenzollerische Landesbahn AG (HzL) ordered five additional trains, worth approximately $28 million. All the Coradia Lint DMUs (diesel multiple units) will be manufactured in Salzgitter, Germany, at Alstom’s biggest production site, worldwide.

“We are very pleased about the confidence once again placed in us regarding our proven Coradia Lint. Starting in 2019, the trains will be operating in Baden-Württemberg and from 2020 in Bavaria, improving railway transport in the regions and bringing passenger comfort to a new level,” said Jochen Slabon, head of sales for Alstom in Germany and Austria.

Ad Loading...

The vehicles ordered by DB Regio will operate on the "Dieselnetz Ulm" network along the routes Ulm-Memmingen (-Buxheim), Ulm-Weissenhorn, and (Ulm-)-Günzburg-Mindelheim. Fifteen trains will be delivered in autumn 2020, while the five remaining will follow in autumn 2022. DB Regio has ordered two different types of trains that can easily be coupled for enhanced operational flexibility. Consisting of eight Coradia Lint 41 seating 125 passengers and 12 Coradia Lint 54 seating 150 people, the fleet can be quickly and easily adapted to the volume of passengers and to the different routes.

The five Coradia Lint 54 ordered by HzL for the Bodenseegürtelbahn network in Baden-Württemberg are identical to the fleet ordered by HzL last year for the “Ulmer Stern” network and will be delivered together with the main fleet in June 2019.

The low-consumption vehicles reach a maximum operating speed of about 87 miles per hour, with high acceleration. The two-part trains feature a seating capacity of 150 passengers and 18 bicycle parking spaces. They are characterized by a comfortable, spacious seating arrangement in which almost every fixed seat is equipped with a table for laptops. The trains are all equipped with WLAN, an entertainment and passenger information system with static and dynamic information monitors and video surveillance to ensure high passenger safety.

More Rail

Security and Safetyby StaffJune 16, 2026

DOT: Brightline Corridor Incidents Fall 30% Following Federal Safety Upgrades

Safety improvements funded through a $25 million federal investment are credited with reducing trespassing and train-vehicle collisions along the Brightline Florida corridor.

Read More →
An LA Metro D Line train in Union Station
Managementby StaffJune 16, 2026

D Line Expansion Fuels Growth Across LA Metro's Rail System

Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.

Read More →
A user demonstrating Metrolink's contactless fare payment pilot.
Technologyby StaffJune 12, 2026

Southern California's Metrolink Debuts Contactless Fare Payment Pilot

Customers traveling between Redlands and Los Angeles can now tap their preferred payment method, including a credit or debit card, mobile wallet, or wearable device, at station validators before boarding and again while exiting.

Read More →
Ad Loading...
A BART train on the tracks.
Managementby StaffJune 12, 2026

California's BART Approves FY27 Budget While Maintaining Service Levels

The budget covers July 1, 2026, through June 30, 2027, a period when pandemic emergency funds run out, the District faces a structural deficit of $375 million, and a regional transit funding measure may appear on the November ballot.

Read More →
A rendering of the Amtrak New York Penn Station renovation
Railby StaffJune 9, 2026

Penn Station Transformation Advances with Design Unveiling

The historic redesign will transform the busiest transit hub in the Western Hemisphere from the tracks to the street level, creating a more efficient, cleaner, and functional experience for more than 600,000 daily commuters and millions of visitors.

Read More →
Groundbreaking event for Second Avenue Subway Phase 2 TBM construction.
Railby StaffJune 9, 2026

Second Avenue Subway Phase 2 Advances into Major Construction Stage

New York Governor Kathy Hochul joined leadership from the MTA, elected officials, and Harlem community leaders to break ground on the major construction stage of the transformative Second Avenue Subway Phase 2 project.

Read More →
Ad Loading...
A man sits in a passenger rail seat and looks at his phone.
Railby Elora HaynesJune 8, 2026

The Invisible Infrastructure of Passenger Flow

What a seat reservation system on Austria’s Railjet trains reveals about the future of rider experience, and why U.S. agencies should pay attention.

Read More →
Aerial view of Caltrain's electric service.
Railby StaffJune 5, 2026

Caltrain Board Approves FY27 Budget, Endorses Efficiency Measures

The move ensures Caltrain service will continue operating as usual in the near term, but long-term financial challenges remain for the rail agency absent a new revenue source.

Read More →
Alstom purchasing site for Acela network manufacturing
Railby StaffJune 4, 2026

Alstom Acquires Delaware Site to Support Amtrak NextGen Acela Fleet

The company is investing more than $55 million to acquire and improve the property and will employ approximately 100 people at this site once it is operational.

Read More →
Ad Loading...
World Cup Crowds Will Test Transit Systems
ManagementJune 3, 2026

When Routine Fails: How Public Transit Must Adapt for the World Cup

The 2026 FIFA World Cup will test transit agencies’ ability to manage unpredictable travel patterns, making real-time data and operational flexibility critical to moving millions of visitors efficiently.

Read More →