Bus

Gillig to supply Washington transit with hybrid buses

Posted on April 6, 2009

Olympia, Wa.-based Intercity Transit will purchase its first six hybrid diesel-electric buses, thanks in large part to $2.33 million in federal stimulus funds recently identified for the agency through the American Recovery and Reinvestment Act (ARRA).

 

The Intercity Transit Authority unanimously authorized the purchase of the 40-foot, low-floor hybrid coaches at its April 1 board meeting. The buses will be built by Gillig Corp. The entire bus manufacturing order will total approximately $3.6 million. Transit officials indicate the stimulus funds will pay for four vehicles and the additional two vehicles are being purchased with other federal funds and a local match of $575,000 by Intercity Transit. 

 

The new buses will replace six of the oldest buses in the Intercity Transit fleet, in operation since 1996 and due for retirement. The FTA suggests retirement of aging vehicles after 12 years. Intercity Transit, however, utilizes an extended lifecycle maintenance program for all its coaches and Dial-A-Lift vehicles to maximize fleet longevity. By the time the new buses arrive in Olympia, the older buses will be between 14 years old and 15 years old.

 

“Choosing transit for your commute is one of the easiest and most effective ways to reduce your own carbon footprint,” said Mike Harbour, Intercity Transit GM. “We are pleased to be able to use these funds to make Olympia’s transit system even greener.”

 

The hybrid coaches are anticipated to arrive in Olympia mid-2010.

 

View comments or post a comment on this story. (0 Comments)

More News

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

New Flyer to supply 14 60-foot articulated buses to Brampton Transit

The vehicles will be delivered starting Q1 2018.

Valley Metro to add 187 ElDorado, New Flyer buses

All vehicles are funded by Federal Transit Administration and a half-cent sales tax that funds the Regional Transportation Plan in Maricopa County, which was approved by voters in 2004.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close