Bus

Chicago Transit graduates 36 new bus drivers

Posted on October 15, 2012

Mayor Rahm Emanuel joined Chicago Transit Authority (CTA) Board Chairman Terry Peterson and CTA President Forrest Claypool in welcoming the second graduating class of new CTA bus drivers hired as part of the upcoming Red Line South reconstruction project.

In preparation for the 2013 project, the CTA is hiring 400 bus drivers who will operate the free shuttle buses and expanded supplemental bus service the CTA will offer customers during the construction project. Thirty-six drivers were part of this recent graduating class, following 33 earlier this month.

"The men and women who are graduating from this program and becoming CTA bus drivers will play a key role in helping Chicagoans go to work and school," said Mayor Emanuel. "These jobs will create economic opportunity throughout our city's neighborhoods."

Nearly all of the new hires came to the CTA after they attended one of the agency’s three bus driver job fairs this summer, or heard or saw the advertisements for the fairs, all of which were held in the footprint of the Red Line project between Roosevelt Road and 95th Street.

“The job fairs we held this summer were a key component of our promise to promote employment opportunities as part of this huge improvement project,” said Claypool. More than 4,000 men and women attended the fairs at Chicago State University, the National Teachers Academy and Kennedy King College in July, August and September.

The bus drivers start out as part-time employees, but eventually become full-time drivers as other drivers retire or leave CTA employment.

CTA bus drivers go through a 23-day training course before being assigned to bus routes. The training focuses on bus operations and customer service, with a strong emphasis on safety. Hiring and training the drivers ensures they will be well-prepared for the Red Line South project, set to begin in May 2013.

View comments or post a comment on this story. (0 Comments)

More News

CHK America completes first tier of GRTC bus stop signage improvements

Tier One modernizes 300 stops along two of GRTC’s busiest routes with each stop receiving upgrades that include new flags with clearly visible route and bus stop numbers as well as eye-level, easy-to-use printed schedule and map information.

Transit management expert to inspire at BusCon 2015 keynote address

The keynote address, “Driving Excellence” will be delivered on Tuesday, Sept. 29, at 11 a.m. by Mark Aesch, CEO of TransPro, a management consultancy that guides transit systems.

Port Authority to realign gates at NYC bus terminal

The changes are aimed at improving bus operations and reducing congestion in the terminal that can stretch back out into the inbound Lincoln Tunnel and beyond.

Mich. BRT plan on track, set for possible 2018 launch

The 8.3-mile route, with a proposed 27 stops, would replace the Capital Area Transportation Authority’s current Route 1 from downtown Lansing to the Meridian Mall. Results from the plan’s environmental assessment study are expected to be shared at a public hearing this fall.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The resource for managers of class 1-7 truck Fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close