Bus

Gannett Fleming completes Pa. rail station rehab

Posted on April 18, 2013

A dilapidated downtown Reading, Pa., rail station has found new life as a bus facility after undergoing a significant restoration and transformation led by Gannett Fleming and Sowinski Sullivan Architects.

The Franklin Street Station, which served as the main station for the Reading Railroad Co. starting in 1929, saw its last train depart in 1981 and stood in disrepair for more than three decades.

The dirty stone walls were marked with graffiti; the windows were broken; and the original concrete platform, walkways, and paving were cracked and broken. Inside, the leaking roof damaged the ornate plaster ceiling, walls and cornices, and the building had become a refuge for pigeons. All electrical and mechanical systems were in need of replacement.

In an effort to salvage the building and convert the site into an intermodal facility, the Berks Area Regional Transportation Authority acquired the property. Gannett Fleming was selected as project engineers to team with prime consultant Sowinski Sullivan Architects to lead the transformation.

The pigeons were ousted, and the grandeur was restored to give travelers modern comfort and convenience, while still maintaining the historic feel of the original station building. The tall windows, terra-cotta walls, terrazzo flooring, iron designs around windows and the wall clock, all originals, are now thoroughly cleaned and restored.

Gannett Fleming performed surveys for the design, transit studies, planning, project management and construction phase services for the project’s structural, electrical, lighting, telecommunications, mechanical, and site development engineering and landscaping.

View comments or post a comment on this story. (0 Comments)

More News

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

New Flyer to supply 14 60-foot articulated buses to Brampton Transit

The vehicles will be delivered starting Q1 2018.

Valley Metro to add 187 ElDorado, New Flyer buses

All vehicles are funded by Federal Transit Administration and a half-cent sales tax that funds the Regional Transportation Plan in Maricopa County, which was approved by voters in 2004.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close