Bus

U.S. DOT releases final rule to streamline environmental reviews for projects

Posted on January 15, 2014

Courtesy DC Streetcar
Courtesy DC Streetcar
The U.S. Department of Transportation (U.S. DOT) released a final rule, “Environmental Impact and Related Procedures,” intended to significantly cut red tape, achieve better environmental outcomes, and spur certain transit and highway projects under the National Environmental Policy Act (NEPA) to completion quicker than in years past.

The new rule responds to President Obama’s call for federal agencies to put people first by streamlining and improving government services wherever possible.

“Time is money, and by cutting the time it takes to manage environmental reviews, we can help save communities money that they can put toward critical transportation projects,” said U.S. Transportation Secretary Anthony Foxx. “This is just one example of the Obama Administration’s commitment to make it easier for communities across the country to get the transportation options they need to reduce congestion and improve access to work, school and other destinations.”

The Federal Transit Administration (FTA) and Federal Highway Administration (FHWA) anticipate that the new rule, issued jointly, will expedite the delivery of certain transit and highway projects — including projects to be built within an existing right-of-way where transportation already exists or projects that receive less than $5 million of federal funding.

The new rule encourages project sponsors and state and regional transportation authorities to build highway and transit projects with fewer impacts to reap the benefits of the quicker, simpler process, which requires less documentation for qualified projects.

The final rule on was published in the Federal Register earlier this week. The rulemaking was required as part of Moving Ahead for Progress in the 21st Century.

Both the FTA and FHWA have taken a number of steps during the past year to cut red tape and bureaucracy to help get critical projects under construction more quickly without compromising a stringent project review process.

In January 2013, FTA announced a streamlined approach for its Major Capital Investment (New Starts/Small Starts) Grant Program. In addition, FTA recently unveiled a new STOPS (Simplified Trips-on-Project Software) tool that, for some communities, may reduce from two years to two weeks the time needed for project sponsors to develop ridership forecasts on planned projects. This new tool may save taxpayers in communities that do not currently have travel forecasting tools as much as $1 million.

Last September, FHWA launched “e-NEPA,” an online collaboration tool expected to greatly reduce the time needed to complete the comprehensive environmental review process for federally funded highway projects.

View comments or post a comment on this story. (0 Comments)

More News

CHK America completes first tier of GRTC bus stop signage improvements

Tier One modernizes 300 stops along two of GRTC’s busiest routes with each stop receiving upgrades that include new flags with clearly visible route and bus stop numbers as well as eye-level, easy-to-use printed schedule and map information.

TransPro’s Mark Aesch to Deliver Keynote Address at BusCon 2015

The session, sponsored by Q’Straint, will surely inspire participants as Aesch will bring to life stories from lessons learned during his many years as a transit management leader and innovator.

Port Authority to realign gates at NYC bus terminal

The changes are aimed at improving bus operations and reducing congestion in the terminal that can stretch back out into the inbound Lincoln Tunnel and beyond.

Mich. BRT plan on track, set for possible 2018 launch

The 8.3-mile route, with a proposed 27 stops, would replace the Capital Area Transportation Authority’s current Route 1 from downtown Lansing to the Meridian Mall. Results from the plan’s environmental assessment study are expected to be shared at a public hearing this fall.

Kiel Seats part of largest refurbished electric fleet in North America

Left on purpose without upholstery option, each double seat weighs only 45 lbs. yet provides an optimum of comfort for riders through its ergonomically formed design. The slim contour of the seat’s back offers a maximum of legroom for passengers and enhanced accessibility getting in and out of the seat.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The resource for managers of class 1-7 truck Fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close