A new U.S Department of Transportation (U.S. DOT) report on the state of America's transportation infrastructure, “2013 Status of the Nation's Highways, Bridges and Transit: Conditions and Performance,” confirms more investment is needed to maintain and improve the nation's highway and transit systems.

“We have an infrastructure deficit in this country, and we need to create more jobs — improving our roads, bridges and transit systems will provide help on both fronts,” said U.S. Transportation Secretary Anthony Foxx. “As the President said in his State of the Union address last month, first-class infrastructure creates first-class jobs. This report shows the difference we made thanks to the Administration’s unprecedented investment under the Recovery Act, but it’s also clear that much more remains to be done.”

The U.S DOT's report, based on 2010 data, estimates all levels of government would need to spend between $123.7 billion and $145.9 billion per year to both maintain and improve the condition of roads and bridges alone. In 2010, federal, state and local governments combined spent $100.2 billion on this infrastructure, including $11.9 billion in American Recovery and Reinvestment Act (ARRA) dollars.

The report also indicates that as much as $24.5 billion is needed per year to improve the condition of transit rail and bus systems. In 2010, total spending to maintain and expand transit systems was $16.5 billion — a spending level also boosted temporarily by ARRA dollars.

According to the report, travel on pavements with good ride quality rose from 46.4% in 2008 to 50.6% in 2010. A major factor in this increase was the one-time funding provided under ARRA, a large share of which was directed toward pavement resurfacing. This 4.2% increase represents the highest two-year jump ever since the metric was first used in 1995. While the report shows overall pavement and bridge conditions have improved in many areas, the improvements have not been uniform across the system.

The report also finds that the nation’s state of good repair and preventive maintenance backlog for transit is at an all-time high of $86 billion and is growing by an estimated $2.5 billion each year. An additional $8.2 billion over current spending levels from all levels of government is needed annually to spend down the current backlog over the next 20 years. While some transit systems are still operating railcars more than 30 years old, the report finds that over three-quarters of the need for repairs affects other facets of our transit systems, such as rail stations, trestles and power substations.

Meanwhile, state and local governments are shouldering more than half the cost of annual investments to preserve and grow the nation’s transit systems.

The biennial report to Congress provides information on the physical and operating characteristics of the highway, bridge and transit components of the nation's surface transportation system. To view the full report, click here.

View comments or post a comment on this story. (0 Comments)

More News

2,627 complaints lodged on Fla.'s HART bus system

The unedited complaints represent only one side of the story and often are fired off by people who are upset. HART says its own GPS and video technology shows many are plain wrong. The agency relies upon the list to target areas of customer service that are in need of improvement.

CHK America wins bus stop improvement contract for GRTC

The three-tiered project will include redesigning the information for more than 2,000 stops throughout the Greater RIchmond Transit Company's service area.

Connecticut's CTfastrak BRT system begins service

The CTfastrak transit system provides direct service to and from Waterbury, Cheshire, Southington, Bristol, Plainville, New Britain, Newington, West Hartford, Hartford, East Hartford and Manchester with routes that take advantage of the bus-only CTfastrak roadway.

Albuquerque BRT project exploring full sponsorship

ABQ RIDE is looking to model its plan after the Greater Cleveland Regional Transit Authority’s HealthLine, which is sponsored through a hospital partnership. Construction on the so-called ART system could begin in May 2016 with an in-service date of September 2017.

New luxury bus service launches in San Francisco

The service, which costs $6 a ride, asks riders to download the Leap app, creating an account, uploading a photo and adding a credit card that enables them to pay via a QR code.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The resource for managers of class 1-7 truck Fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close