Bus

Ind.'s Transpo adds first New Flyer CNG bus

Posted on September 19, 2014

Indiana’s South Bend Public Transportation Corp. (Transpo) received the first new bus in over 11 years at the Emil “Lucky” Renzik Administration, Maintenance and Operations Facility. There will be a total of 16 new fixed-route buses to replace 15-year old vehicles that have reached and exceeded their useful life.

Transpo selected the New Flyer Xcelsior to replace the aging Gillig Phantoms and low-floor buses. The bus is built in the U.S. and Transpo worked with New Flyer to utilize as many “Made in Indiana” components as possible. A complete list of Indiana suppliers is included in the attached vehicle overview.

The new buses are powered by compressed natural gas (CNG). The New Flyer Xcelsior is the same length, at 35 feet, as the older buses, but offers four additional seats per vehicle and features a sleek, contemporary look representing the connectivity that Transpo provides throughout South Bend and Mishawaka.

Transpo and the City of South Bend previously announced a partnership to build the first fast-fuel CNG facility in the region that will be open to the public. Transpo expects to break ground on the new facility later this year which will be located on their current property. The fueling center is expected to be operational in early 2015.

Transpo expects to have all 16 new buses on property by the end of year. Once the vehicles are on site, inspections will be completed, equipment installed, and operator and maintenance training will take place. The buses should be ready to go into service in early 2015.

View comments or post a comment on this story. (0 Comments)

More News

UTA takes delivery of Provo/Orem BRT bus

The New Flyer Xcelsior 60-foot articulated bus is the first to be delivered and will now go through a thorough testing process.

FTA makes $226M in grants available to improve transit bus service

All projects must comply with Buy America regulations, which require that all iron, steel, or manufactured products be produced in the U.S., as well as final assembly of vehicles.

WSP USA designing BRT system for TriMet

The 14-mile Division Transit Project will provide an improved high-capacity connection between downtown Portland and the City of Gresham via Division Street.

New Flyer to supply 14 60-foot articulated buses to Brampton Transit

The vehicles will be delivered starting Q1 2018.

Valley Metro to add 187 ElDorado, New Flyer buses

All vehicles are funded by Federal Transit Administration and a half-cent sales tax that funds the Regional Transportation Plan in Maricopa County, which was approved by voters in 2004.

See More News

Post a Comment

Post Comment

Comments (0)

More From The World's Largest Fleet Publisher

Automotive Fleet

The Car and truck fleet and leasing management magazine

Business Fleet

managing 10-50 company vehicles

Fleet Financials

Executive vehicle management

Government Fleet

managing public sector vehicles & equipment

TruckingInfo.com

THE COMMERCIAL TRUCK INDUSTRY’S MOST IN-DEPTH INFORMATION SOURCE

Work Truck Magazine

The number 1 resource for vocational truck fleets

Schoolbus Fleet

Serving school transportation professionals in the U.S. and Canada

LCT Magazine

Global Resource For Limousine and Bus Transportation

Please sign in or register to .    Close