July 1, 2010

Study: Nearly $120M in transit earmarks unspent

Nearly $120 million in Federal Transit Administration (FTA) earmarks that were introduced and approved by Congress have sat untouched in FTA accounts for years and have now lapsed, according to a new analysis by the Sunlight Foundation Reporting Group, a Washington, D.C.-based, non-partisan, nonprofit that focuses on making government transparent and accountable.

 

According to documents Sunlight obtained through the Freedom of Information Act (FOIA), local recipients never spent $119.2 million set aside by Congress through more than 150 earmarks in 2006 and 2007 that should have funded public transit projects in several communities across the U.S.

 

These funds were allocated under The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for User (SAFETEA-LU) and should have been spent by Sept. 30, 2009 at the latest. Along with its analysis, the Sunlight Foundation Reporting Group also released a spreadsheet that details which projects were never completed and how much earmarked funds should have been spent.

 

In a companion piece, Sunlight also described the difficulty its researchers encountered when trying to obtain data from the FTA. At first, the government released printouts of a database, and once only sent the first tab of a multi-tabbed spreadsheet, underscoring the need for electronic disclosure. After multiple FOIA requests and clarifications, Sunlight was finally able to get the information it needed. The information Sunlight released on June 22 is not publicly available elsewhere.

 

"Members of Congress disclose when they request or fund earmarks, but there is no mechanism for following through to see how or even if that money is spent. This begs the question: What happens to the funds for what we’re describing as ‘disappearmarks’?” said Bill Allison, editorial director for the Sunlight Foundation. “We need better disclosure — and that means online and in real-time — to see how federal funds are being spent from the time a lawmaker allocates them to when the project they fund is implemented."

 

According to Sunlight, the top ten lapsed earmarks are:

 

1. $19.6 million for a proposed New Starts light rail system by the Triangle Transit Authority in North Carolina that which expired in 2008.

 

2. Nearly $10 million to assist in constructing Renaissance Square in Rochester, N.Y., that would have included a performing arts center, a college satellite campus and a bus terminal. The project was canceled in 2009.

 

3. $4.9 million for a proposed commuter rail between Ann Arbor and Detroit that expired in 2008.

 

4. $4 million for a Trans-Hudson Midtown Corridor Study for New Jersey Transit.

 

5. $3.9 million Detroit Center City Loop.

 

6. $3.9 million for the Schuylkill Valley Metro, a proposed railway that would have linked Philadelphia with Reading, Pa., that expired in 2008.

 

7. $3.4 million for the Rhode Island Integrated Commuter Rail Project.

 

8. $2.8 million for an extension of the Metro Gold Line from Pasadena to Montclair.

 

9. $2.8 million for a downtown transit center in Indianapolis.

 

10. Nearly $2.5 million for a public bus transfer and parking facility at the Billings Clinic in Montana.

 

Read the full report at http://bit.ly/disappearmarks2

 

 

deli.cio.us digg it stumble upon newsvine
[ Request More Info about this product / service / company ]


E-NEWSLETTER

Receive the latest Metro E-Newsletters in your inbox!

Join the Metro E-Newsletters and receive the latest news in your e-mail inbox once a week. SIGN UP NOW!

View the latest eNews
Express Tuesday | Express Thursday | University Transit

White Papers

Mass Transit Capital Planning An overview of the world-class best practices for assessing, prioritizing, and funding capital projects to optimize resources and align with the organization’s most critical immediate and long-term goals.

The Benefits of Door-to-Door Service in ADA Complementary Paratransit Many U.S. transit agencies continue to struggle with the quality of ADA service, the costs, and the difficulties encountered in contracting the service, which is the method of choice for a significant majority of agencies. One of the most basic policy decisions an agency must make involves whether to provide door-to-door, or only curb-to-curb service.

Mass transit mobile Wi-Fi & the public sector case study How Santa Clara Valley Transportation Authority successfully implemented Wi-Fi on its light rail and bus lines

More white papers


STORE
METRO Magazine - January 2014

METRO Magazine
Here are the Highlight:
  • Top 50 Motorcoach Operators
  • Innovative Motorcoach Operators
  • Rail Crossing Safety in Effect
    And much more…
  •  
    DIGITAL EDITION

    The full contents of Metro Magazine on your computer! The digital edition is an exact replica of the print magazine with enhanced search, multimedia and hyperlink features. View the current issue