METRO Magazine Logo
MenuMENU
SearchSEARCH

Study: Nearly $120M in transit earmarks unspent

More than 150 earmarks in 2006 and 2007, allocated under SAFETEA-LU, would have funded public transit projects in several communities across the U.S. had they been spent by Sept. 30, 2009.

July 1, 2010
3 min to read


Nearly $120 million in Federal Transit Administration (FTA) earmarks that were introduced and approved by Congress have sat untouched in FTA accounts for years and have now lapsed, according to a new analysis by the Sunlight Foundation Reporting Group, a Washington, D.C.-based, non-partisan, nonprofit that focuses on making government transparent and accountable.

 

According to documents Sunlight obtained through the Freedom of Information Act (FOIA), local recipients never spent $119.2 million set aside by Congress through more than 150 earmarks in 2006 and 2007 that should have funded public transit projects in several communities across the U.S.

Ad Loading...

 

These funds were allocated under The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for User (SAFETEA-LU) and should have been spent by Sept. 30, 2009 at the latest. Along with its analysis, the Sunlight Foundation Reporting Group also released a spreadsheet that details which projects were never completed and how much earmarked funds should have been spent.

 

In a companion piece, Sunlight also described the difficulty its researchers encountered when trying to obtain data from the FTA. At first, the government released printouts of a database, and once only sent the first tab of a multi-tabbed spreadsheet, underscoring the need for electronic disclosure. After multiple FOIA requests and clarifications, Sunlight was finally able to get the information it needed. The information Sunlight released on June 22 is not publicly available elsewhere.

 

"Members of Congress disclose when they request or fund earmarks, but there is no mechanism for following through to see how or even if that money is spent. This begs the question: What happens to the funds for what we’re describing as ‘disappearmarks’?” said Bill Allison, editorial director for the Sunlight Foundation. “We need better disclosure — and that means online and in real-time — to see how federal funds are being spent from the time a lawmaker allocates them to when the project they fund is implemented."

 

According to Sunlight, the top ten lapsed earmarks are:

 

1. $19.6 million for a proposed New Starts light rail system by the Triangle Transit Authority in North Carolina that which expired in 2008.

Ad Loading...

 

2. Nearly $10 million to assist in constructing Renaissance Square in Rochester, N.Y., that would have included a performing arts center, a college satellite campus and a bus terminal. The project was canceled in 2009.

 

3. $4.9 million for a proposed commuter rail between Ann Arbor and Detroit that expired in 2008.

 

4. $4 million for a Trans-Hudson Midtown Corridor Study for New Jersey Transit.

 

5. $3.9 million Detroit Center City Loop.

 

6. $3.9 million for the Schuylkill Valley Metro, a proposed railway that would have linked Philadelphia with Reading, Pa., that expired in 2008.

Ad Loading...

 

7. $3.4 million for the Rhode Island Integrated Commuter Rail Project.

 

8. $2.8 million for an extension of the Metro Gold Line from Pasadena to Montclair.

 

9. $2.8 million for a downtown transit center in Indianapolis.

 

10. Nearly $2.5 million for a public bus transfer and parking facility at the Billings Clinic in Montana.

 

Read the full report at http://bit.ly/disappearmarks2

 

 

More Paratransit

A maintenance person with a tablet.
ManagementJune 5, 2026

Reinventing Fleet Maintenance with Real-time Visibility and AI

Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.

Read More →
SamTrans planning for ballot measure
Managementby StaffJune 4, 2026

SamTrans Sets Priorities for Potential Connect Bay Area Revenue

The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.

Read More →
Managementby StaffJune 1, 2026

Chicago's NITA Act Moves Into Next Phase as Service Improvements Begin

Rider-focused improvements will begin rolling out across the system immediately as CTA, Metra, and Pace increase service this summer in the six-county region.

Read More →
Ad Loading...
frontrunner bus image
SponsoredJune 1, 2026

A True Low-Floor Minibus Design Delivers Better Accessibility and Efficiency for Everyone

As transit demands evolve, so should your fleet. Download the whitepaper to see how the Low-Floor Frontrunner Minibus compares to traditional options.

Read More →
thumbnail for 2026 METRO Buyer’s Guide & Directory
SponsoredMay 27, 2026

2026 METRO Buyer’s Guide & Directory

Searching for the right vehicles, technology, equipment, or services for your public transit or motorcoach operation? This industry guide brings together manufacturers and suppliers from across the transportation market — all in one place. Download it to connect with the companies that help agencies and operators improve mobility, enhance operations, and move their organizations forward.

Read More →
Emily DeVito and her children
Managementby Alex RomanMay 26, 2026

Rays the Mark Foundation to Honor CDTA’s Emily DeVito at October Fundraiser

Event at Chicago-area Ravisloe Country Club will support DeVito, a transit employee and mother of twins battling kidney failure and awaiting a transplant.

Read More →
Ad Loading...
A Heliox charger on KC Metro property

King County Test Heliox Chargers, Keolis Lands California Contract Top Biz Briefs

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →
Spare logo for Fixed Route Platform
Technologyby StaffMay 19, 2026

Spare Expands AI-Native Operations Platform With Fixed-Route Capabilities

The launch marks a major milestone in Spare’s vision for unified transit operations.

Read More →
Trinity Metro On Demand Vehicle
Technologyby StaffMay 19, 2026

Via Announces Scheduling and Supply Studio

The Scheduling and Supply Studio provides the world’s first fully integrated platform for optimizing vehicle and driver availability to rider demand, said company officials.

Read More →
Ad Loading...
MBTA Green Line Construction
Railby StaffMay 18, 2026

Boston's MBTA Completes Latest Green Line Work

The work took place during 12 consecutive days of shuttle bus service replacement between Kenmore and Cleveland Circle. 

Read More →