METRO Magazine Logo
MenuMENU
SearchSEARCH

Port Authority awards last contract for WTC transportation hub

The Oculus, designed by Santiago Calatrava, will serve as the primary link for pedestrian access to the PATH system, 13 New York City subway lines, 500,000 square feet of retail, and four office towers at the WTC site and the World Financial Center.

March 1, 2011
Port Authority awards last contract for WTC transportation hub

 

2 min to read


[IMAGE]WTC-Transport-Hub-full-3.jpg[/IMAGE]Last week, the Port Authority of New York & New Jersey board of commissioners approved a major construction contract to fabricate and erect the steel for the signature Santiago Calatrava-designed Oculus, which will serve 250,000 people daily as the gateway to the World Trade Center Transportation Hub and its various interconnected transit systems and world-class green office and retail space.

The award marks the last major contract for the WTC Transportation Hub, with 94 percent of the contracts now awarded.

The Oculus will serve as the primary link for pedestrian access to the PATH system, 13 New York City subway lines, 500,000 square feet of world-class retail, four office towers at the WTC site and the World Financial Center — representing one of the most extensive underground pedestrian connections in the city.

Under the $221 million contract, Skanska/Koch Inc., a division of Skanska USA Civil, will build the signature structure that will frame the transportation hub’s main concourse. The contract includes fabricating and erecting approximately 11,000 tons of structural steel.

This contract — along with increased insurance costs and other trade contracts associated with the Hub project — required the Port Authority to draw down $180 million from a $600 million program-wide contingency fund that the agency established in 2008. This allocation will go toward a board-reauthorized Transportation Hub budget of $3.44 billion, up from $3.26 billion.

In addition, the board authorized $151 million to fund expenses related to the commercial infrastructure that supports the office space site-wide as well as approximately $8 million for systems-integration planning given the interconnectedness of all of the site’s projects.

Ad Loading...

Of this $159 million total, $61 million will be allocated out of the board-approved WTC East Side Development Plan, which was authorized in August 2009 to establish greater certainty over the phased development of the commercial office space in the east bathtub, and the rest will be allocated from the $600 million of program-wide contingency.

Taken together, these authorizations leave a total of $322 million of program-wide contingency for future risks, on top of $280 million in Hub contingency that the FTA previously established.

Work also is under way to build the foundations for the Transit Hall and Oculus, which will be the most visible part of the Transportation Hub given that most of the Hub is being built below street level.

Construction is being done around the existing temporary PATH Station and #1 Subway Line to allow around-the-clock train service to continue.

To view video and photos of the most recent construction progress on the WTC Transportation Hub, click here.

More Bus

Frontrunner's new facility in Billerica, Massachusetts.
Busby StaffJune 8, 2026

Frontrunner Bus Group Expands with New Massachusetts Headquarters

The significantly larger facility will provide the infrastructure needed to support the company’s growing workforce, advanced technologies, and expanding product line.

Read More →
New MobilityJune 5, 2026

Joshua Schank on Transportation Innovation, Risk, and the Future of Mobility

In this edition of METROspectives, Joshua Schank discusses lessons from launching LA Metro’s Office of Extraordinary Innovation, the challenges of advancing new mobility technologies, and much more.

Read More →
A maintenance person with a tablet.
ManagementJune 5, 2026

Reinventing Fleet Maintenance with Real-time Visibility and AI

Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.

Read More →
Ad Loading...
SamTrans planning for ballot measure
Managementby StaffJune 4, 2026

SamTrans Sets Priorities for Potential Connect Bay Area Revenue

The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.

Read More →
World Cup Crowds Will Test Transit Systems
ManagementJune 3, 2026

When Routine Fails: How Public Transit Must Adapt for the World Cup

The 2026 FIFA World Cup will test transit agencies’ ability to manage unpredictable travel patterns, making real-time data and operational flexibility critical to moving millions of visitors efficiently.

Read More →
Bus Roadeo at APTA Mobility 2026
Busby Staff and News ReportsJune 1, 2026

Photo Highlights from APTA's 2026 Mobility Conference

The photo gallery captures scenes from the conference, including the International Bus Roadeo, exhibit hall activities, the Bus Showcase, and much more.

Read More →
Ad Loading...
Managementby StaffJune 1, 2026

Chicago's NITA Act Moves Into Next Phase as Service Improvements Begin

Rider-focused improvements will begin rolling out across the system immediately as CTA, Metra, and Pace increase service this summer in the six-county region.

Read More →
A SEPTA bus going down the road
Managementby StaffJune 1, 2026

Philadelphia's SEPTA Approves Annual Transit Service Plan

Between 2021 and 2024, SEPTA held more than 200 public meetings — including 144 in-person sessions — throughout the SEPTA service region.

Read More →
frontrunner bus image
SponsoredJune 1, 2026

A True Low-Floor Minibus Design Delivers Better Accessibility and Efficiency for Everyone

As transit demands evolve, so should your fleet. Download the whitepaper to see how the Low-Floor Frontrunner Minibus compares to traditional options.

Read More →
Ad Loading...
A New Flyer 60-foot articulated bus
Busby StaffMay 29, 2026

WMATA Debuts 'Fares Pay for Service' Awareness Campaign

The campaign was highlighted during a media event at the Paul S. Sarbanes Transit Center in Silver Spring, where WMATA’s GM/CEO Randy Clarke joined Metro Transit Police officers, WMATA management team, board members, and staff to expand fare enforcement and customer education efforts on Metro Bus routes throughout the region.

Read More →