Twin tunnel boring machines will begin by tunneling parallel underground sections between the future Wilshire/La Brea Station and the current Wilshire/Western Purple Line terminus.
NYC Comptroller Stringer called on the MTA to improve job access, reduce commute times, extend the reach of the transit system, and relieve overcrowding.
Featuring the work of five local artists along the corridor, the pilot aims to bring more efficient and reliable service.
The coaches are equipped with Cummins engines, Wi-Fi, satellite TV, and outlets with USB ports.
The buses will support Grand Rapids’ second new BRT line, with funding provided by the FTA and the Michigan DOT.
The agency is currently looking to replace the entirety of its fleet with zero-emissions vehicles by 2032.
Select buses will feature the exclusive GPS-based technology from BAE Systems.
Career includes public and private sector experience with positions as planner, engineer, maintenance director, GM, and executive director.